MARYLAND I-270 INTEGRATED CORRIDOR MANAGEMENT (ICM)
CONCEPT OF OPERATIONS
STAGE 1 FINAL

Download the free Adobe Reader to view PDFs You will need the Adobe Reader to view the PDFs on this page.

PDF (2.4 MB)

March 31, 2008 

FHWA-JPO-08-002
EDL Number 14388

Submitted to:

U.S. Department of Transportation
Federal Highway Administration
Federal Transit Administration
Research and Innovative Technology Administration

TABLE OF CONTENTS

Notice and Quality Assurance Statement

Technical Report Documentation Page

1. SCOPE AND SUMMARY

1.1 Introduction and Document Contents

1.2 ICM Corridor Boundaries, Networks and Stakeholders

1.3 Corridor operating and institutional conditions

1.4 Need and Potential for Integrated Corridor Management

1.5 ICM Vision, Goals and Objectives

1.6 ICM Operational Framework, Approaches, and Strategies

1.7 ICM Concept Operational Description

1.8 Required Assets and ICM Implementation Issues

1.9 I-270 Corridor ICM Concept Institutional Framework

2. REFERENCES

3. EXISTING CORRIDOR SCOPE AND OPERATIONAL CHARACTERISTICS

3.1 Corridor Boundaries and Networks

3.2 Corridor Stakeholders

3.3 Operational Conditions of the I-270 Corridor and Included Networks

3.4 Existing Network-Based Transportation Management/ITS Assets

3.5 Proposed Near-Term Network Improvements

3.6 Current Network Based Institutional Characteristics

3.7 Regional ITS Architecture Review

3.8 Corridor Issues and Needs

3.9 Potential for ICM in the I-270 Corridor

3.10 I-270 Corridor Vision

4. ICM SYSTEM OPERATIONAL CONCEPT

4.1 Corridor Goals and Objectives

4.2 ICM Framework

4.3 ICM Approaches

4.4 Application of ICM Approaches and Strategies

4.5 ICM Concept Asset Requirements and Needs

4.6 Comparison of ICM Concept Asset Requirements with Current and Potential Assets

4.7 I-270 Corridor Concept Operational Description

4.8 Alignment With Regional ITS Architecture

4.9 Implementation Issues

4.10 ICM Corridor Institutional Framework

4.11 Performance Measures and Targets

5. OPERATIONAL SCENARIOS

5.1 Daily Operational Scenario

5.2 Scheduled Event Scenario

5.3 Incident Scenario

5.4 Evacuation Scenario

ICM CONOPS SUPPLEMENT

TABLE OF FIGURES

Figure 3-1. I-270 Montgomery County ICM Corridor

Figure 3-2. I-270 ICM Corridor Detector Locations

Figure 3-3. I-270 ICM Corridor HAR, DMS, CCTV, and RWIS Locations

Figure 3-4. Map of the MARC Brunswick Line

Figure 3-5: The Metrorail Network

LIST OF TABLES

Table 1-1. I-270 Corridor Stakeholders

Table 1-2. Critical Needs of the I-270 Corridor

Table 1-3. I-270/Montgomery County Corridor Goals and Objectives for ICM

Table 1-4. Proposed ICM Approaches and Strategies for the I-270 Corridor

Table 1-5. Additional Required Assets for ICM Implementation

Table 3-1. I-270 Corridor Network Characteristics

Table 3-2. I-270 Corridor Stakeholders

Table 3-3. Average Annual Daily Traffic and Level of Service on I-270

Table 3-4. MD-355 Average Annual Daily Traffic

Table 3-5. Connector Route Annual Average Daily Traffic

Table 3-6. Average Metrorail Weekday Ridership in the I-270 Corridor

Table 3-7. Metrobus Average Weekday Boardings per Trip

Table 3-8. Average Weekday Ridership on Selected Ride On Routes

Table 3-9. Network-Based Transportation Management/ITS Assets

Table 3-10. I-270 Corridor Critical Needs

Table 4-1. I-270/Montgomery County Corridor Goals and Objectives for ICM

Table 4-2. Relationship Between I-270 ICM Corridor Needs and Goals

Table 4-3. Proposed ICM Approaches and Strategies for the I-270 Corridor

Table 4-4. Relationship between I-270 ICM Operational Strategies and Corridor Goals

Table 4-5. I-270 Corridor Market Packages

Table 4-6. I-270 Corridor Communications Infrastructure

Table 4-7. I-270 Corridor Asset Requirements

Table 4-8. I-270 Corridor Market Packages

Table 4-9. I-270 Corridor Communications Infrastructure

Table 4-10. I-270 Corridor Asset Requirements

Table 4-11. Summary of Significant Changes and Additions to the I-270 Corridor

Table 4-12. I-270 ICM Implementation Issues

Table 4-13. I-270 ICM Baseline Performance Measures and Targets

Table 4-14. Sample Potential Performance Measure Targets

Table 5-1. Daily Operational Scenario

Table 5-2. Scheduled Event Scenario

Table 5-3. Minor Traffic Incident Scenario

Table 5-4. Major Traffic Incident Scenario

Table 5-5. Evacuation Scenario

Table S-1 Updated I-270 Corridor Needs

1. SCOPE AND SUMMARY

1.1 Introduction and Document Contents

This document presents the Concept of Operations (ConOps) for an Integrated Corridor Management (ICM) system along the Interstate-270 Corridor in Montgomery County, Maryland. The document offers a user-oriented view of the system concept. It progresses logically from a discussion of characteristics and conditions in the corridor, to an examination of the corridor’s transportation operational needs, to identification of an integrated management concept for addressing those needs. It concludes with consideration of a series of operational scenarios.

This document was prepared jointly for the Federal Highway Administration and Federal Transit Administration, under the Integrated Corridor Management Program (Cooperative Agreement No. DTFH61-06-H-00042). It was prepared by the Maryland Department of Transportation in association with Montgomery County and the Washington Metropolitan Area Transit Authority. The University of Maryland’s Center for Advanced Transportation Technology and Telvent Farradyne Inc. assisted with the preparation of this report.

1.2 ICM Corridor Boundaries, Networks and Stakeholders

The I-270 Corridor is located in Montgomery County, Maryland just outside Washington, D.C. The corridor measures approximately 20 miles in length and consists of a variety of transportation networks, including:

A map of the I-270/Montgomery County Corridor is presented in Figure 3-1 (see Section 3.1). The major boundaries of the corridor include the following:

The corridor is part of the broader Metropolitan Washington Council of Governments (MWCOG) region.

Key stakeholders in the I-270 Corridor are identified in Table 1-1, below:

Table 1-1. I-270 Corridor Stakeholders

Partnering Agencies

Agencies partnering for Phase I of the U.S. DOT’s Discretionary Cooperative Agreement for Integrated Corridor Management include:

  • Federal Highway Administration (FHWA)

  • Federal Transit Administration (FTA)

  • Maryland State Highway Administration (MDSHA)

  • Maryland Transit Administration (MTA)

  • Montgomery County Department of Public Works and Transportation

  • The University of Maryland (UMD)

  • Washington Metropolitan Area Transit Authority (WMATA)

Stakeholders

Other agencies with a stake in the outcome of the U.S. DOT’s Discretionary Cooperative Agreement for Integrated Corridor Management of the I-270 Corridor include:

  • Bethesda

  • City of Gaithersburg

  • City of Rockville

  • Commercial Vehicle Companies

  • CSX Rail

  • Event Promoters

  • Federal Emergency Management Agency

  • Frederick County Department of Public Works and Transportation

  • General Public

  • Maryland Emergency Management Agency (MEMA)

  • Maryland State Police (MSP)

  • Maryland Transportation Authority (MdTA)

  • Metro Transit Police

  • Montgomery County Police

  • Montgomery County Fire and EMS

  • Montgomery County School Districts

  • National Capital Region Transportation Planning Board

  • North Bethesda Transportation Management District

  • Private Sector Information Service Providers

  • Regional Media Outlets

  • Towing Industry

  • University of Maryland Center for Advanced Transportation Technology

  • Virginia Department of Transportation (VDOT)

1.3 Corridor Operating and Institutional Conditions

The I-270 Corridor, also referred to as the Technology Corridor, links significant suburban residential concentrations with the major employment regions of Northern Virginia, downtown Washington, D.C., the Capital Beltway, and along the I-270 Corridor itself. As with most urban areas in the United States, the trend in the Metropolitan Washington, D.C. area has been that development expands outward from the city. However, most commuters in the I-270 Corridor are not heading into Downtown Washington, but to other suburban locations. Because of high-traffic volumes in the corridor, and the impact that incidents even outside the corridor can have on I-270 conditions, congestion has become a monumental problem.

Some of the current operating conditions in the I-270 Corridor are:

The partner agencies involved in the Montgomery County I-270 Integrated Corridor Management initiative are represented on the National Capital Region Transportation Planning Board (NCR/TPB), which is the federally-designated metropolitan planning organization (MPO) for the region.

1.4 Need and Potential for Integrated Corridor Management

The I-270 the corridor is highly directional and connects most commuters with their work place locations, either in Washington D.C., Northern Virginia, Maryland, or within Montgomery County itself. During rush hour, the commuter volume routinely exceeds capacity. In addition, unplanned events, such as incidents within or outside the corridor, can impact the transportation system, producing large-scale travel delays, secondary incidents, etc. There is a need to expand corridor-wide information sharing to help disseminate reliable and real-time traveler information to the commuters.

The other modes available to the commuters in the corridor are the MARC commuter train, WMATA Metro Rail and bus system and the Montgomery County Ride On bus system. The MARC commuter train makes only eight stops in the corridor. The Metrorail system has many stops serving many commuters, but only extends to Shady Grove, which is roughly halfway down the corridor. Many commuters using Metrorail must either park and ride at the station or take Ride On or Metrobus to the rail stations, thus adding more time to their commutes.

The critical needs of the corridor are summarized in Table 1-2, below.

Table 1-2. Critical Needs of the I-270 Corridor

Incident and Emergency Management

Issue:

Non-recurring congestion is a monumental impediment to mobility in the corridor.

Needs:

  • Stakeholder agencies — both highway and transit — need clearly articulated roles, responsibilities, and procedures for coordinated management and response to incidents and conditions in the corridor.

  • Agencies need concrete plans for diverting traffic from freeways to arterials.

  • Agencies need innovative, synergistic, and multi-modal approaches to managing incidents and congestion.

  • Agencies need to detect and verify incidents quickly and efficiently.

  • Agencies need mechanisms and procedures for sharing information on incidents and conditions.

  • Agencies need tools and procedures that optimize operational decision-making.

  • Agencies need metrics for measuring and assessing performance and conditions in the corridor, both on freeways and arterials.

Traffic Signals

Issue:

Traffic signals in the corridor are often not optimized for conditions.

Needs:

  • Traffic signals on arterials along the corridor need to be able to respond instantly to changing traffic conditions.

  • Traffic signals need to be able to respond to changing conditions both on the affected arterials and adjacent roadways, including I-270.

  • Before signal systems are modified, determination is needed regarding optimal signalized responses under alternative scenarios.

  • Traffic signal prioritization for emergency vehicles is desirable.

Transit and Commuter Management

Issue:

Transit services in the corridor are often inconvenient for rush-hour commuters.

Needs:

  • Commuters need reliable transit information and services.

  • Commuters need on-demand access to rail/bus schedules and rail/bus real-time status.

  • Commuters need on-demand access to information comparing travel times by automobile and transit in real-time.

  • Commuters need to know where available parking spaces in commuter lots are located.

  • Commuters need easy and convenient access from commuter lots to Metrorail and MARC stations.

  • An infrastructure that encourages unplanned automobile commuter shifts to transit, when conditions warrant, is desirable.

  • Commuters desire broader, more integrated usage of “smartcards” in the corridor.

  • Use of HOV lanes needs to be made easier and more convenient.

Traveler Information

Issue:

Travelers often do not have sufficient information about roadway, traffic, and transit conditions to make informed travel decisions.

Needs:

  • Travelers need access to accurate, reliable, and multi-modal travel information, both pre-trip and en-route.

  • Travelers need travel conditions information in sufficient detail that they can make “smart” decisions about staying the course, selecting alternate routes, shifting travel modes, skipping or postponing travel, etc.

  • Travelers need information about alternative routes/modes when conditions so dictate.

Infrastructure

Issue:

Infrastructure limitations sometimes impair responsiveness to changing traffic and congestion conditions.

Needs:

  • Expanded detection and verification capabilities are needed across all transportation networks.

  • Expanded capabilities are needed to deliver traveler information to customers.

  • Partner agencies need to be able to assess corridor-specific performance.

1.5 ICM Vision, Goals and Objectives

Vision: In the future, transportation operations within the I-270/Montgomery County corridor function at peak efficiency by optimizing the use of the capacities of the different transportation modes within the corridor. Key technology systems and decision support tools within the corridor are interoperable and real-time information on road and traffic conditions is commonly exchanged among the corridor’s managing partners and stakeholders. Operational strategies within the corridor are routinely adjusted in response to changing corridor conditions. Strategic management of the corridor emphasizes multi-modalism, and commuters have flexible access to real-time transit and parking lot information. Travelers are apprised of current road surface, traffic, and transit conditions — pre-trip and en-route; this information is then used to make informed travel and routing decisions. Performance metrics are employed across the corridor to assess variations in efficiency and safety benchmarks, refine the existing approaches, and formulate and deploy follow-on operational strategies.

To further this vision, four ICM goals have been identified:

Table 1-3, below, specifies the objectives associated with each goal.

Table 1-3. I-270/Montgomery County Corridor Goals and Objectives for ICM

Goals

Objectives

Optimize Mobility, Reliability, and Safety: Achieve the highest practical levels of mobility through the corridor. Maximize mobility and minimize delays associated with incidents and other non-recurring conditions. Make the travel experience more predictable and reliable so that day-to-day fluctuations in travel times are less extreme. Optimized performance, with less volatility and reduced exposure to adverse conditions, will affirmatively impact safety.

  • Reduce overall trip and person travel-time.

  • Improve travel predictability and reliability.

  • Lessen the probability of secondary crashes by responding expeditiously to incidents.

  • Maximize inter-modal activity.

  • Empower customers to make intelligent travel choices.

  • Measure, monitor, and assess performance.

Strengthen Corridor-Level Decision Support: Upgrade the information-exchange infrastructure to more quickly put more comprehensive, fact-based information on incidents and roadway conditions in the hands of responders, traffic managers, and other stakeholders. Furnish tools that support adept decision making resulting in faster response and clearance.

  • Optimize identification of incidents and adverse conditions.

  • Enhance the exchange of accurate, timely information among partners.

  • Emphasize corridor management and decision-making based on data and factual circumstances.

  • Improve rapid response to changing traffic, incident, and weather conditions.

Enhance Reliable, Real-Time Information to Customers: The precepts here are two-fold: (1) travelers deserve to be informed about roadway/transit conditions and circumstances; and (2) as travelers are kept apprised of conditions, they will be empowered to make intelligent choices and thereby be active agents in optimizing mobility.

  • Expand and standardize the types of information available to travelers.

  • Emphasize dissemination of real-time conditions and status data across modes.

  • Furnish adequate information to travelers so they can make informed decisions on routing, modal shifts, etc.

Promote Multi-Modalism: Promote reductions in the volume of vehicles traversing the corridor by making transit and carpooling more attractive to customers. Even for those travelers who loathe to permanently abandon single-occupant vehicle travel, encourage ad hoc shifts to alternative modes as conditions warrant.

  • Emphasize bus and rail as practical alternatives to roadway travel.

  • Promote park-and-riding and park-and-carpooling.

  • Simplify inter-modal transfers.

1.6 ICM Operational Framework, Approaches, and Strategies

Five specific ICM approaches, all building on existing initiatives, are anticipated:

The specific operational strategies associated with each of the five ICM approaches are shown in Table 1-4, below.

Table 1-4. Proposed ICM Approaches and Strategies for the I-270 Corridor

Prototype and Deploy Enhanced RITIS

  • Prepare/update corridor incident response plans.

  • Establish publish/subscribe connections with key corridor stakeholders.

  • Automate real-time information-sharing among corridor stakeholders.

  • Provide real-time, corridor-based traveler information to media and other ATIS providers via the Web and direct data feeds.

  • Provide real-time corridor traveler information, including transit, to travelers via the Web, 511, mobile devices, and in-vehicle devices.

  • Provide real-time information to agencies to aid in decision support.

  • Archive corridor transportation, traffic, transit, and incident response data for performance measurement.

Optimize Traffic Signals on Arterials

  • Develop operational strategies, responses, and procedures.

  • Enable automated traffic-responsive and traffic-adaptive operation of signals.

  • Include enhanced capabilities such as potentially providing priority to Ride On and Metrobus.

  • Evaluate performance of the Traffic Signal System and arterial operations through the collection and processing of current information on systems performance.

Deliver CAD/AVL Status Information to Transit Users

  • Define CAD/AVL information procedures and protocols.

  • Integrate the CAD/AVL system on WMATA buses with the system on Ride On buses.

  • Build on the integrated system to provide automated information-sharing on bus and train locations between WMATA and Ride On.

  • Use AVL data to furnish real-time transit information to travelers, including bus location, next bus/train arrival time, bus/train schedules, etc.

  • Use AVL data for bus schedule adherence evaluation.

Deliver Parking Availability Information to Commuters

  • Define parking availability information procedures and protocols.

  • Expand ongoing pilot projects in the corridor to additional parking lots.

  • Disseminate real-time parking space availability to travelers at remote locations using DMS, mobile phones and other personal information devices, Web sites, etc.

  • Publicize these measures to encourage park-and-ride in the corridor.

Measure Operations Performance

  • Identify parameters and procedures for assessing performance from CHART and RITIS.

  • Expand measures to include other factors (e.g., transit).

  • Gather pertinent data and archive in RITIS.

  • Analyze data to assess performance.

  • Disseminate performance findings to stakeholders.

1.7 ICM Concept Operational Description

The proposed operational enhancements to the I-270/Montgomery County Corridor are intended to improve the efficiency by optimizing the use of capacities within the transportation modes and the reliability of travel along the corridor. The daily operation of the corridor will remain very similar to the current operations executed by each stakeholder agency. Each agency’s system will have an interface to RITIS, which will allow the automatic input of relevant data. RITIS, in turn, will automatically provide each agency’s system with information regarding the operational status of the assets from other agencies.

The integration of the I-270 ICM corridor is designed to be done very quickly without requiring major institutional modifications or major construction projects and be deployable within a short period of time. Corridor response plans will be developed by a joint effort among all of the stakeholders and implemented within each agency. RITIS will support the generation of performance measures reports.

RITIS will link to existing (and potentially new) venues for disseminating information to the general public. The information is expected to be more comprehensive, reliable, and timely than are the data currently available. Motorists will be able to make smarter, better-informed decisions both pre-trip and en-route. In particular, travelers will have access to information that may make usage of transit services more attractive to them.

The I-270 Corridor will function as an integrated transportation system to benefit travelers and users.

1.8 Required Assets and ICM Implementation Issues

The I-270 ICM corridor is a mature corridor with various agencies in the corridor having deployed systems for transportation management. Hence, many of the assets required for I-270 specific integrated corridor management (ICM) are already deployed or are in the process of being deployed. The I-270 ICM approach builds on this existing infrastructure and initiatives in the region such as RITIS, which was initially conceived as a metropolitan-wide system, or other initiatives that are progressing without a more corridor-wide focus. Table 1-5, below, shows the additional assets which will be required for a successful ICM implementation. Each item’s projected completion date is listed in parentheses.

Table 1-5. Additional Required Assets for ICM Implementation

Network

Stakeholder

Changes and Additions

Freeway Network

Maryland State Highway Administration (MDSHA)

  • Additional DMS on I-270 (2010).

  • Additional detectors along I-270 to collect volumes, speeds, and travel time (2010).

  • Additional CCTV along I-270 (2010).

  • Additional two-way communications linkages between Montgomery County and CHART to support video-sharing and other incident-related data (2008).

  • Interface with RITIS for providing and extracting real-time information (2007).

  • Interface with RITIS for extracting archived data for performance analysis and evaluation (2008).

  • Decision-support software (2010).

  • Access to a Corridor Simulation Model (2009).

Arterial Network

Montgomery County Department of Public Works and Transportation (DPWT)

  • Additional DMS on arterials (2010).

  • Additional detectors along arterials to collect volumes, speeds, and travel time (2010).

  • Additional CCTV along arterials (2010).

  • Additional two-way communications linkages between Montgomery County and CHART to support video-sharing and other incident-related data (2008).

  • Decision-support software as part of the signal system upgrade. (Mid-2009)

  • Interface with RITIS for providing and extracting real-time information (2008).

  • Access to a Corridor Simulation Model (2009).

  • Interfaces with existing corridor-wide systems (2008).

  • Adaptive signal control system. (Central System, mid-2009; Signal Controllers, 2009-2013, with corridor signals given priority.)

MARC Commuter Rail Network

Maryland Transit Administration (MTA)

  • Surveillance of park-n-ride lots at the stations for real-time monitoring of parking availability (2009).

  • Parking management software (2009).

  • DMS for parking information dissemination (2008).

  • Interface with RITIS for providing and extracting real-time information (2008).

Metrorail Network

Washington Metropolitan Area Transit Authority (WMATA)

  • Surveillance of park-n-ride lots at the five stations for real-time monitoring of parking availability (2009).

  • Parking management software (2009).

  • DMS for parking information dissemination (2009).

  • Interface with RITIS for providing and extracting real-time information (2008).

Metrobus Network

Washington Metropolitan Area Transit Authority (WMATA)

  • Interface with RITIS for providing and extracting real-time information (2008).

  • Integration with Ride On CAD/AVL system (2008).

  • CAD/AVL information dissemination system (2009).

  • Enhancements to CAD software to identify optimal routes (2010).

  • Interface to CAD, including protection/security of sensitive information (2009).

Ride On Network

Montgomery County Department of Public Works and Transportation (DPWT)

  • Interface with RITIS for providing and extracting real-time information (2008).

  • Information-sharing system with WMATA and MTA (2008).

  • CAD/AVL information dissemination system (2008).

  • Enhancements to CAD software to identify optimal routes (2009).

  • Interface to CAD, including protection/security of sensitive information (2009).

1.9 I-270 Corridor ICM Concept Institutional Framework

The goal for institutionalizing an I-270 ICM structure will be to utilize established regional frameworks instead of creating an entirely new structure. Weaving the I-270 ICM initiative into the fabric of the current regional ITS, operations, and management institutional frameworks makes sense from a resource perspective. This will also help integrating the I-270 ICM-related projects into existing planning and funding processes. It will also make use of the synergy between the goals and initiatives of the various regional ITS, operations, and management groups and the I-270 ICM initiative by using the I-270 ICM initiative as a “test bed” for ITS strategies being considered at a broader regional level.

2. REFERENCES

References Specific to the I-270 Corridor

General References for Integrated Corridor Management

Systems Engineering

ITS, Operations, Architecture, Other

3. EXISTING CORRIDOR SCOPE AND OPERATIONAL CHARACTERISTICS

This section describes existing conditions and needs in the I-270/Montgomery County Corridor.

3.1 Corridor Boundaries and Networks

The Interstate-270 Corridor is located in Montgomery County, Maryland just outside of Washington D.C. The corridor, which measures approximately 20 miles in length, encompasses (1) the I-270 freeway, (2) the arterials adjacent to I-270, (3) public bus routes (both Ride On, operated by Montgomery County, and Metrobus, operated by the Washington Metropolitan Area Transit Authority (WMATA), (4) subway rail routes (WMATA’s Metrorail Red Line), and (5) a commuter rail network (the Maryland Rail Commuter (MARC) Brunswick line).

The I-270 Corridor was originally planned as a commuter corridor for travel between suburban Maryland and Washington, D.C. However, with more businesses relocating to the suburbs, including Rockville and Silver Spring, Maryland and Tysons Corner, Dulles, and Reston, Virginia, the corridor has increasingly functioned as a gateway for travelers to and from the Capital Beltway (I-495), which encircles Washington and connects to other highways and business centers. Also, significant numbers of commuters work at locations along or near the I-270 Corridor itself.

The I-270/Montgomery County Corridor, as defined in this study, is identified in Figure 3-1. The corridor’s boundaries are delineated as follows:

The corridor has significant impacts on the regional transportation system that extend well beyond the formally-designated boundaries. For example, a sizable number of commuters travel to and from points outside the corridor’s boundaries. Additionally, incidents and delays on I-270 often affect conditions on other roadway networks across the region. The I-270 Corridor is part of the broader National Capital Region Transportation Planning Board (TPB) region.

The networks comprising the I-270 Corridor are identified and described in Table 3-6.

Figure 3-1. I-270 Montgomery County ICM Corridor
Image Source: Montgomery County Department of Public Works and Transportation (DPWT)

Montgomery County ICM Corridor Map
Click here for large detailed image

Figure 3-2. I-270 ICM Corridor Detector Locations
Image Source: DPWT

This figure shows the Detector Locations on the I-270 corridor

Figure 3-3. I-270 ICM Corridor HAR, DMS, CCTV, and RWIS Locations
Image Source: DPWT

This figure shows the HAR, DMS, CCTV and RWIS Locations on the I-270 corridor

Table 3-1. I-270 Corridor Network Characteristics

Corridor Element

Characteristics

Freeway Network

  • The freeway network consists of I-270 from the Frederick/ Montgomery County Line to the Capital Beltway I-495). I-270 is classified as an “urban” interstate.

  • The corridor, from north to south, is delineated below:

    • The Frederick County Line to MD-121 – Approximately 4 miles; two northbound and southbound general purpose lanes.

    • MD-121 to MD-118 – Approximately 3 miles; two northbound and three southbound general purpose lanes; and one northbound HOV lane.

    • MD-118 to MD-124 – Approximately 4 miles; three northbound and southbound general purpose lanes; one northbound HOV lane; and four southbound general purpose lanes.

    • MD-124 to I-379 – Approximately 2 miles; three northbound and four southbound general purpose lanes; one northbound and southbound HOV lane; and two northbound collector-distributor lanes.

    • I-370 to the Capital Beltway – Approximately 9 miles; three northbound and southbound general purpose lanes; one northbound and southbound HOV lane; and two northbound and southbound collector-distributor lanes.

Arterial Network

  • MD-355 is the only arterial that parallels I-270 throughout the I-270/ Montgomery County ICM Corridor.

    • In the southern portion of the corridor, MD-355 is a multi-lane signalized arterial.

    • From Gaithersburg north, it is primarily a two-lane rural highway.

  • Other north-south routes include the Great Seneca Highway, the Wootton Parkway, Seven Locks Road, and River Road.

MARC Commuter Rail Network

  • The Maryland Transit Administration (MTA) provides commuter rail service along the I-270 Corridor. The Maryland Rail Commuter (MARC) offers service from Martinsburg, West Virginia to downtown Washington, D.C. along the Brunswick Line. MARC stations in the corridor are located at:

    • Dickerson (parking).

    • Barnesville (parking and connection to Ride On).

    • Boyds (parking).

    • Germantown (parking and connection to Ride On).

    • Metropolitan Grove (parking and connection to Ride On).

    • Gaithersburg (parking and connection to Ride On).

    • Washington Grove (parking and connection to Ride On).

    • Rockville (parking and connection to Ride On and Metro).

    • Garrett Park (parking and connection to Ride On).

Metrorail Network

  • WMATA’s Red Line serves the I-270 Corridor along MD-355 from Shady Grove to the Capital Beltway and into downtown Washington, D.C. The following Metrorail stations are located in the corridor:

    • Shady Grove (parking and connection to Ride On & Metrobus).

    • Rockville (700 parking spacing and connection to Ride On, Metrobus, & MARC).

    • Twinbrook (parking and connection to Ride On & Metrobus).

    • White Flint (parking and connection to Ride On & Metrobus).

    • Grosvenor-Strathmore (parking and connection to Ride On & Metrobus).

Metrobus Network

  • Metrobus is WMATA’s regional bus transit network serving the entire Metropolitan Washington, D.C. area. A Metrobus garage is located in Rockville. The following Metrobus routes operate inside the corridor:

    • J5 – The J5 Route follows MD-355 from the Twinbrook Metrorail station to the Capital Beltway.

    • J7 and J9 – The J7 and J9 routes are express bus routes running on I-270 from the Lake Forest Transit Center to the Capital Beltway.

    • T2 – The T2 route runs from the Rockville Metrorail station to the Friendship Heights Metrorail station, following Great Falls Road (MD-189) to River Road (MD-190).

    • Q2 – The Q2 route follows MD-355 from the Shady Grove Metrorail station to the Rockville Metrorail station.

Ride On Network

  • The Ride On network is Montgomery County’s local bus service. The network is designed to link commuters to other transit services – i.e., Metrorail, Metrobus, and MARC. There are 11 transit centers within the corridor.

MTA Commuter Bus

  • The Maryland Transit Administration (MTA) has several commuter bus lines serving Maryland, with one in the I-270 Corridor. The line operates only in the peak direction during the AM and PM rush hours. Buses run at 15 minute headways, picking up passengers outside the corridor, and stopping at the Shady Grove Metro Station and five locations in Rock Spring Business Park.

3.2 Corridor Stakeholders

Key ICM stakeholders for the I-270 Corridor are identified in Table 3-2, below.

Table 3-2. I-270 Corridor Stakeholders

Partnering Agencies

The following agencies are partnered in the development of the ICM initiative:

  • Federal Highway Administration (FHWA)

  • Federal Transit Administration (FTA)

  • Maryland State Highway Administration (MDSHA)

  • Maryland Transit Administration (MTA)

  • Montgomery County Department of Public Works and Transportation (DPWT)

  • The University of Maryland (UMD)

  • Washington Metropolitan Area Transit Authority (WMATA)

Stakeholders

The following entities have potentially important stakes in the outcome of the ICM initiative and have advised and guided the process:

  • Bethesda

  • City of Gaithersburg

  • City of Rockville

  • Commercial Vehicle Companies

  • CSX Rail

  • Event Promoters

  • Federal Emergency Management Agency

  • Frederick County Department of Public Works and Transportation

  • General Public

  • Maryland Emergency Management Agency (MEMA)

  • Maryland State Police (MSP)

  • Maryland Transportation Authority (MdTA)

  • Metro Transit Police

  • Montgomery County Police

  • Montgomery County Fire and EMS

  • Montgomery County Public Schools

  • National Capital Region Transportation Planning Board

  • North Bethesda Transportation Management District

The following stakeholders are responsible for operating one or more networks within the I-270 Corridor:

3.3 Operational Conditions of the I-270 Corridor and Included Networks

3.3.1 The Freeway Network

The I-270/Montgomery County Corridor contains a single interstate highway, I-270. Originally built in the early 1950’s as a four-lane roadway called the Washington National Pike (US-240), the travel route now designated as I-270 has been widened and substantially improved over the years.

Table 3-3, below, identifies average annual daily traffic (AADT) counts and level of service (LOS) for key segments of I-270.

Table 3-3. Average Annual Daily Traffic and Level of Service on I-270

Section of I-270 (from South to North)

2005 AADT

LOS AM Peak Direction

LOS PM Peak Direction

South of MD-187 (East Y Split)

127,000

F

F

North of MD-187B (West Y Split)

126,000

F

F

North of Tuckerman Lane

256,000

F

F

North of Montrose Road

261,000

F

E

North of Falls Road

264,000

F

E

North of MD-28

241,000

F

E

North of Shady Grove Road

219,000

F

F

North of I-370

208,000

F

F

South of MD-124

172,000

F

F

South of Middlebrook Road

164,000

D

F

South of MD-118

130,000

C

D

South of Father Hurley Blvd.

117,000

D

C

South of MD- 121

98,000

C

E

South of MD-121 (ATR0004)

97,000

C

E

North of MD-121

94,000

E

E

South of Frederick County Line

87,000

E

E

3.3.2 The Arterial and Connector Route Network

The I-270/Montgomery County Corridor has a limited number of north-south arterials paralleling the freeway. The only truly viable alternative is MD-355. Other routes providing north-south access in the vicinity include: MD-85 to MD-28 and MD 112/MD-190. These routes, however, do not provide nearly the capacity of, or ease of connection to, I-270 that MD-355 does.

In the southern portion of the corridor, MD-355 is a multi-lane signalized arterial. From Gaithersburg north, it is primarily a two-lane rural highway. MD-355 is characterized as follows:

Within the I-270 Corridor, traffic varies on MD-355 based on the volume of traffic at signalized intersections, I-370, and the Capital Beltway. Traffic also varies due to trip origin and destination points including commercial districts, sources of employment, and residential areas. Table 3-4, below, provides annual average daily traffic (AADT) counts for MD-355.

Table 3-4. MD-355 Average Annual Daily Traffic

MD-355 Segments (from South to North)

2005 AADT

North of I-495 Interchange

55,000

Between I-495 and Old Georgetown Road

54,000

Between Montrose Rd. and Great Falls Road

57,000

Between West Montgomery Avenue and Gude Drive

49,000

Between Gude Drive and Shady Grove Road

48,000

South of MD-124

36,000

Between MD-124 and MD 118

33,000

South of MD-118

29,000

Between MD-118 and MD-27

37,000

Between MD-27 and MD-121

13,000

Between MD-121 and MD-109

11,000

North of MD-109

9,000

Twelve connector routes link I-270 to MD-355. These routes provide varying levels of service from I-270 to MD-355. The routes also have different numbers of access lanes and very different volumes of traffic. Table 3-5, below, characterizes these routes.

Table 3-5. Connector Route Annual Average Daily Traffic

Arterial Connection

I-270 Exit #

Lanes of Access

2005 AADT

MD-109/Old Hundred Road

22

2

9,000

MD-121/Clarksburg Road

18

2

14,000

MD-27/Father Hurley Blvd/Ridge Road

16

4

25,000

MD-118/Germantown Road

15

4

29,000

Middlebrook Road

13

4

31,000

MD-124/Quince Orchard Road/ Montgomery Village Avenue

11

4 and 2

81,000

MD-117/West Diamond Avenue

10

2

44,000

I-370

9

6

76,000

Shady Grove Road

8

4

40,000

West Montgomery Avenue

6

4 and 3

25,000

Great Falls Road

5

4 and 2

29,000

Montrose Road

4

4

63,450

MD-187/Old Georgetown Road

1

4

45,000

3.3.3 The MARC Commuter Rail Network

The Maryland Transit Administration (MTA) provides commuter rail service along the I-270 Corridor. The Maryland Rail Commuter (MARC) Train offers service from Martinsburg, West Virginia into downtown Washington D.C. along the MARC Brunswick Line. The stations and passenger service along the corridor are oriented predominantly towards commuters working in downtown Washington, D.C., as well as commuters who work in Rockville, Silver Spring, and other Montgomery County locations.

The MARC Brunswick Line serves approximately 2,524 riders during the AM peak and a total of 5,047 riders daily. Rail cars on the MARC trains are generally filled to capacity and demand is high for added service — a need not easily filled since the MARC trains share the track with CSX freight trains. Transfers are available from MARC to Metrorail at the Rockville and Silver Spring stations.

Figure 3-4 shows the route covered by the MARC Brunswick Line. The stations serviced by the Brunswick Line that lie within the I-270 ICM, from NW to SE, are:

Figure 3-4. Map of the MARC Brunswick Line
Image Source: Maryland Transit Administration

This is a map of the MARC Brunswick Line

3.3.4 The Metrorail Network

WMATA’s Metrorail network serves the entire Washington, D.C. region. The network consists of five Metro lines, as depicted in Figure 3-5, below.

Figure 3-5: The Metrorail Network
Image Source: Washington Metropolitan Area Transit Authority

This is a map of the Metrorail Network

The Red Line serves commuters in the I-270 Corridor; it runs along MD-355 from Shady Grove to the Capital Beltway and into downtown Washington. Metrorail stations within the corridor include Shady Grove, Rockville, Twinbrook, White Flint, and Grosvenor-Strathmore.

The Red Line is WMATA’s busiest line and the only one that does not share its track with another line. Because it is the only subway line serving the area, WMATA runs two routes along the Red Line during the morning and afternoon peaks. One route runs all the way to Shady Grove; the other turns around at the Grosvenor-Strathmore Station to accommodate the higher volumes of riders closer to the city. All Metrorail stations support transfers to Metrobus and Ride On. The Rockville station also serves as a MARC station.

Metrorail travel patterns are consistent with the rest of the corridor. Morning peak travel moves predominantly in the direction of downtown Washington, D.C., whereas the afternoon peak moves from Washington towards the Maryland suburbs. Average weekday ridership for the morning and afternoon peak hours on the Red Line is summarized in Table 3-6.

Table 3-6. Average Metrorail Weekday Ridership in the I-270 Corridor

Station Name

Entry/Exit

Average Weekday

AM Peak

AM Off

PM Peak

PM Off

Total

Grosvenor

Entry

3,464

891

796

275

5,428

Exit

336

549

2,827

1,359

5,072

White Flint

Entry

1,227

713

1,396

344

3,682

Exit

1,253

598

1,246

579

3,678

Twinbrook

Entry

2,332

853

1,070

275

4,531

Exit

827

621

1,990

1,029

4,468

Rockville

Entry

2,288

809

894

245

4,237

Exit

745

646

2,110

760

4,262

Shady Grove

Entry

9,570

1,874

1,514

402

13,360

Exit

936

1,321

8,027

2,896

13,181

3.3.5 The Metrobus Network

Metrobus is WMATA’s regional bus transit network serving the Metropolitan Washington, D.C. area. Within the I-270 Corridor, Metrobus has four routes that directly service commuters inside the corridor. These routes are:

All four Metrobus routes provide opportunities for transfers to Metrorail and Ride On. Additionally, the Q2 and T2 link to MARC at the Rockville Metrorail Station. Average weekday passengers per trip for each route are provided in Table 3-7, below.

Table 3-7. Metrobus Average Weekday Boardings per Trip

Metrobus Route

3:00am to 5:30am

5:30am to 9:30am

9:30am to 3:00pm

3:00pm to 7:00pm

7:00pm to 3:00am

J5

N/A

17.55

N/A

12.25

N/A

J8/J9

N/A

18.88

23.50

17.97

N/A

T2

N/A

31.67

22.48

26.63

14.29

Q2

27.13

61.94

70.26

78.98

52.64

3.3.6 The MTA Commuter Bus Network

The MTA Commuter Bus provides long distance service during peak periods parallel to MARC rail lines. Route 991 begins north of Montgomery County and travels south on I-270 during the AM rush. Buses stop at the Rockville Metro station, and again at the Rock Spring Business Park, near I-495. Buses operate only in the peak direction at 15 minute headways. Average daily ridership in April 2007 was 975 passengers. Most buses are operating at capacity, and because there is a “no standing” rule in effect, it’s difficult to accurately measure demand.

3.3.7 The Ride On Network

Ride On is Montgomery County’s local bus service that provides concentrated service within the I-270 Corridor. Bus service emphasizes connections to Metrorail, Metrobus, and MARC. Bus service is also available at key Park-n-Ride lots, including the following:

Table 3-8, below, shows average weekday ridership for key Ride On bus routes:

Table 3-8. Average Weekday Ridership on Selected Ride On Routes

Route

Origin

Destination

Weekday Ridership

54

Lakeforest

Rockville Metro Station

2,038

55

Germantown Transit Center

Rockville Metro Station

6,900

56

Lakeforest

Rockville Metro Station

2,364

59

Montgomery Village Center

Rockville Metro Station

3,910

70

Milestone Park and Ride

Bethesda Metro Station

547

71

Kingsview Park and Ride

Shady Grove Station

306

75

Urbana Park and Ride

Shady Grove Station

229

79

Milestone Park and Ride

Shady Grove Station

129

83

Milestone Park and Ride

Germantown Transit Center

697

90

Damascus

Shady Grove Station

860

124

MD-124 Park and Ride

Shady Grove Station

71

3.4 Existing Network-Based Transportation Management/ITS Assets

The I-270/Montgomery County Corridor consists of a variety of networks operated by different stakeholders. Table 3-9, below, identifies the available ITS infrastructure and assets held by these transportation networks.

Table 3-9. Network-Based Transportation Management/ITS Assets

Network

Stakeholder

Stakeholder Facilities

ITS Infrastructure/ Assets

Freeway Network

Maryland State Highway Administration (MDSHA)

  • Statewide Operations Center (SOC)

  • Traffic Operations Center 3 (TOC-3)

  • MDSHA Maintenance Shops (one located in the I-270 ICM corridor in Gaithersburg)

  • CHART ATMS Software

  • EORS Software

  • Radio Communications

  • CCTV Cameras (5 existing in corridor)

  • DMS (4 existing, 2 planned) - but not in advance of every cross-network junction. NTCIP1 protocols used for DMS communications

  • HAR (2 existing, 1 planned)

  • SHAZAM Beacons (1 existing, 4 planned)

  • Loop Detector (ATR) (2 existing)

  • Radar Detectors (RTMS) (8 existing, 7 planned)

  • RWIS (2 existing)

  • Highway Service Patrols (12 vehicles)

  • CHART Web site

  • Private-Sector Websites

Arterial Network

Montgomery County Department of Public Works and Transportation (DPWT)

  • Montgomery County Traffic Management Center

  • Montgomery County Technical Center (signal shop)

  • Montgomery County Equipment Maintenance Operations Center

  • Montgomery County ATMS Software – controlling CCTV, DMS, HAR

  • Montgomery County Traffic Signal System (TSS) – accessible via the ATMS software

  • Traffic Signals (793 in total; 194 in the corridor signals)

  • CCTV Cameras (47 existing in corridor)

  • Traffic Advisory Radio (4 existing) – same as HAR devices

  • Loop Detectors (190 counting stations in corridor

  • Government-owned cable television station

  • Government-owned traffic monitoring airplane

MARC Commuter Rail Network

Maryland Transit Administration (MTA)

  • MTA MARC Operations Center

  • MTA MARC Brunswick Line Stations

    • Dickerson

    • Barnesville

    • Boyds

    • Germantown

    • Metropolitan Grove

    • Gaithersburg

    • Washington Grove

    • Rockville

    • Garrett Park

  • MARC Monitor and Control System

  • Radio Communications

  • PA Traveler Announcement System

  • LED Traveler Information Display Signs

  • Station Security Cameras

  • Fare Collection System

  • SmarTrip Cards

  • GPS-based train location and schedule adherence tracking and alert system underway

  • Migration to T1 Ethernet backbone for all field devices

Metrorail Network

Washington Metropolitan Area Transit Authority (WMATA)

  • WMATA Rail Operations Control Center

  • WMATA Metrorail Stations

    • Shady Grove

    • Rockville

    • Twinbrook

    • White Flint

    • Grosvenor-Strathmore

  • WMATA Rail Yard

  • Platform DMS

  • CCTVs at each station

  • Biological and chemical detection sensors

  • Radio Communications

  • PA Traveler Announcement System

  • Passenger Information Displays (10 existing)

  • CCTV surveillance cameras

  • RideGuide

  • SmarTrip Cards

Metrobus Network

Washington Metropolitan Area Transit Authority (WMATA)

  • WMATA Bus Operations Control Center

  • WMATA Bus Stops

  • WMATA Bus Garage

  • OrbCAD NT

  • Mobile Data Terminals (MDT)

  • Automatic Passenger Counters

  • Automatic Vehicle Location (AVL)

  • Fare Payment System

  • Bus Annunciation

  • CCTV Surveillance Cameras

  • Ride Guide

  • SmarTrip Card System

Ride On Network

Montgomery County Department of Public Works and Transportation (DPWT)

  • Montgomery County Transit Management Center

  • Montgomery County Vehicle Service Park

  • Montgomery County Bus Depots

  • Orbital Operating System

  • Automatic Vehicle Location (AVL)

  • Fare payment system

  • Bus Annunciation

  • CCTV surveillance cameras on buses; video only recorded but not transmitted in real-time

  • 10 DMS signs in selected bus shelters

  • SmarTrip Cards

  • Signal Priority (planned, see below for further information)

3.5 Proposed Near-Term Network Improvements

Near-term network improvements proposed for the I-270 ICM Corridor are summarized below. The improvements are categorized by network type and responsible agency; anticipated timetables and completion dates are also shown, where appropriate:

Freeway — Maryland State Highway Administration (MDSHA)

Arterials — Montgomery County DOT

Railway/Metro

Maryland Transit Administration’s (MTA) Maryland Regional Commuter (MARC) Train:

Washington Metropolitan Area Transit Authority (WMATA):

For the purpose of this listing of near-term improvements, the two types of transportation modes operated by WMATA (Metrorail and Metrobus) are combined here because these improvements affect both modes.

Bus Service — Ride On:

Representative enhancements planned or underway are summarized below:

3.6 Current Network-Based Institutional Characteristics

The partner agencies involved in the Montgomery County I-270 Integrated Corridor Management initiative are represented on the National Capital Region Transportation Planning Board (NCR/TPB), which is the federally-designated metropolitan planning organization (MPO) for the region. Over the last 15 years, considerable progress has been made in establishing an institutional framework conducive to ITS and operations within the NCR/TPB structure. In addition, there have been a number of ongoing regional operations coordination initiatives, including the Regional Operations Coordination Committee (ROCC) that, since the late 90’s, has been working to improve ITS operations planning and coordination. Most recently, transportation agencies in the region have gotten together to strengthen regional coordination and communications on everyday conditions, management, and major regional transportation incidents through creation of the Metropolitan Area Transportation Operations Coordination (MATOC) Program.

It is clear that the current institutional environment in the region lends itself to supporting the I-270 ICM in the near-term and, more importantly, over the long-term as ICM activities become mainstreamed as part of ongoing regional operations initiatives.

Transportation Planning Board and the Subcommittee on Management, Operations, and Intelligent Transportation Systems

The TPB is housed under the Metropolitan Washington Council of Governments (COG). COG is composed of 21 local governments surrounding the nation’s capital, plus area members of the Maryland and Virginia legislatures, the U.S. Senate, and the U.S. House of Representatives. COG provides a focus for action and develops sound regional responses to issues such as the environment, housing, economic development, health and family concerns, human services, population growth, public safety, and transportation. The TPB, as the federally designated MPO for the region, prepares transportation plans and programs that the federal government must approve in order for federal-aid transportation funds to be spent in the Washington, D.C. region. Members of the TPB include representatives of local governments; state transportation agencies; the Maryland and Virginia General Assemblies; the Washington Metropolitan Area Transit Authority; and non-voting members of the Metropolitan Washington Airports Authority (MWAA) and federal agencies.

Within the TPB committee structure, a Coordination Planning Subcommittee on Management, Operations, and Intelligent Transportation Systems (MOITS) is responsible for ensuring that the key elements of management, operations, and ITS are reflected in the metropolitan transportation planning process. The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires statewide and regional transportation plans to consider “operational and management strategies to improve the performance of existing transportation facilities to relieve vehicular congestion and maximize the safety and mobility of people and goods.” Major topics that are relevant to the I-270 ICM institutional infrastructure that will be advanced by the TPB through MOITS within the FY 2008 Unified Planning Work Program (UPWP) for Transportation Planning include:

With regard to the last topic, a significant Transportation Emergency/Security Planning program has been established outside of the TPB’s UPWP funded through U.S. Department of Homeland Security and COG local funding. The specialized needs for transportation involvement in Homeland Security directed preparedness are being addressed by the Regional Emergency Support Function #1 (RESF-1) Transportation Committee in the COG public safety committee structure with coordination and support from the MOITS subcommittee of TPB.

Another significant TPB coordination planning responsibility that relates to the I-270 ICM initiative is the Congestion Management Process (CMP). The regional CMP is a required component of the regional transportation planning process and is intended to address the systematic management of traffic congestion and provision of information on transportation system management of traffic congestion and provision of information on transportation system performance. Components of a CMP include a system for data collection and performance monitoring, strategies for addressing congestion, performance measures, or criteria for identifying when action is needed, and a system for prioritizing which congestion management strategies would be most effective. Under the FY08 UPWP, the TPB will undertake an analysis for development of CMP components of the Constrained Long-Range Plan working in coordination with the Travel Forecasting Subcommittee, Commuter Connections Subcommittee, MOITS Subcommittee, Technical Committee, and the Regional Travel Trends Report and Regional Transportation Data Clearinghouse efforts.

Metropolitan Area Transportation Operations Coordination (MATOC) Program

In late 2006, the states of Maryland and Virginia, and the District of Columbia demonstrated their commitment to coordinate and support regional sharing of transportation systems’ conditions and information management during regional incidents by formally executing an agreement for the establishment and maintenance of the Metropolitan Area Transportation Coordination Program. This commitment to coordinate will be manifested through integration of systems’ technologies, improved procedures and planning, and enhanced accuracy and timeliness of transportation information provided to the public. The MATOC Program is led by a Steering Committee currently comprised of representatives from the District Department of Transportation, Maryland Department of Transportation, Virginia Department of Transportation, and the Washington Metropolitan Area Transit Authority, with COG as the administrative agent. Development and implementation of the MATOC Program is reflected in the Transportation Improvement Program (TIP) of the TPB.

Currently, the MATOC Steering Committee is working on a contract for the services of a Program Implementation Manager (PIM) and technical support team to initiate formal implementation of the program. The PIM will be focusing on the identification of needs and opportunities for systems integration and enhancements and managing the process by which Steering Committee agencies agree to implement actions needed for systems integration. With regard to regional incidents, the PIM will examine ongoing operations and available operating procedures to identify needs and opportunities for interagency standard operating procedures and managing the process by which the Steering Committee agencies implement actions needed to enhance regional operations coordination processes.

MATOC is the oversight body for important regional initiatives such as the Regional Integrated Transportation Information System (RITIS), which will be leveraged extensively by the I-270 ICM project. RITIS is a data fusion and dissemination system that will compile transportation data from each participating agency, standardize it, and make it available to other participating agencies through each agency’s existing transportation management system. RITIS will facilitate communications and coordination during incident response and management. It will also archive data for use in transportation-related studies and performance evaluations. In addition to the I-270 ICM partners, current agency participants include DDOT and VDOT.

Regional Operations Coordination Committee

In 1997, a committee called the Regional Operations Coordination Committee (ROCC) was formed to develop a framework for all participating agencies to conduct coordinated transportation management at the regional level. The ROCC’s geographic focus is the Maryland National Capital Region and it includes representatives from transportation (traffic and transit) and public safety agencies in the State of Maryland, Montgomery County, and Prince George’s County.

Today, the ROCC continues to meet on a regular basis and has served as the catalyst for accomplishing numerous achievements since its inception. Highlights of these achievements include:

3.7 Regional ITS Architecture Review

The I-270 Corridor is documented and depicted in the Maryland Statewide ITS Architecture, which virtually all the I-270 Corridor stakeholders participated in developing. The MD Architecture is available online at: http://www.rita.dot.gov/cgi-bin/ExitPage/good_bye.cgi?url=http://www.itsmd.org/. The corridor is also part of the Metropolitan Washington Regional ITS Architecture (MWRITSA), which diagrams macro-level, center-to-center communications among stakeholders in the National Capital Region. Because the MWRITSA relies heavily on input from the MD Architecture, this section concentrates on the Maryland Statewide ITS Architecture.

Planned functionality, as reflected in the MD Architecture, includes the following:

The Maryland ITS Architecture Advisory Panel maintains the MD Architecture and provides a conformity form online for users to submit projects for conformity assessment. The Conformity Form and instructions are available online at:

http://www.rita.dot.gov/cgi-bin/ExitPage/good_bye.cgi?url=http://www.itsmd.org/index.php?page_id=919.

Conformity Forms are reviewed and archived in support of project conformity to the Architecture and maintaining a repository of necessary Architecture updates. The MD Architecture is currently being updated, with the next version to be published in late 2007. Projects developed as part of the I-270 ICM effort will be submitted to the Maryland ITS Architecture Advisory Panel via the Conformity Form. The projects will then be evaluated for compliance with the Architecture; once designs are finalized, the Maryland Architecture will be updated to reflect those designs.

3.8 Corridor Issues and Needs

This section describes the principal issues and needs of the I-270/Montgomery County Corridor. These needs were identified during workshops and discussions involving key stakeholders. Needs were organized and examined by five operational areas, as follows:

The most important needs identified by stakeholders are summarized in Table 3-10, below.

Table 3-10. I-270 Corridor Critical Needs

Incident and Emergency Management

Issue:

Non-recurring congestion is a monumental impediment to mobility in the corridor.

Needs:

  • Stakeholder agencies — both highway and transit — need clearly articulated roles, responsibilities, and procedures for coordinated management and response to incidents and conditions in the corridor.

  • Agencies need concrete plans for diverting traffic from freeways to arterials.

  • Agencies need innovative, synergistic, and multi-modal approaches to managing incidents and congestion.

  • Agencies need to detect and verify incidents quickly and efficiently.

  • Agencies need mechanisms and procedures for sharing information on incidents and conditions.

  • Agencies need tools and procedures that optimize operational decision-making.

  • Agencies need metrics for measuring and assessing performance and conditions in the corridor, both on freeways and arterials.

Traffic Signals

Issue:

Traffic signals in the corridor are often not optimized for conditions.

Needs:

  • Traffic signals on arterials along the corridor need to be able to respond instantly to changing traffic conditions.

  • Traffic signals need to be able to respond to changing conditions both on the affected arterials and adjacent roadways, including I-270.

  • Before signal systems are modified, determination is needed regarding optimal signalized responses under alternative scenarios.

  • Traffic signal prioritization for emergency vehicles is desirable.

Transit and Commuter Management

Issue:

Transit services in the corridor are often inconvenient for rush-hour commuters.

Needs:

  • Commuters need reliable transit information and services.

  • Commuters need on-demand access to rail/bus schedules and rail/bus real-time status.

  • Commuters need on-demand access to information comparing travel times by automobile and transit in real-time.

  • Commuters need to know where available parking spaces in commuter lots are located.

  • Commuters need easy and convenient access from commuter lots to Metrorail and MARC stations.

  • An infrastructure that encourages unplanned automobile commuter shifts to transit, when conditions warrant, is desirable.

  • Commuters desire broader, more integrated usage of “smartcards” in the corridor.

  • Use of HOV lanes needs to be made easier and more convenient.

Traveler Information

Issue:

Travelers often do not have sufficient information about roadway, traffic, and transit conditions to make informed travel decisions.

Needs:

  • Travelers need access to accurate, reliable, and multi-modal travel information, both pre-trip and en-route.

  • Travelers need travel conditions information in sufficient detail that they can make “smart” decisions about staying the course, selecting alternate routes, shifting travel modes, skipping or postponing travel, etc.

  • Travelers need information about alternative routes/modes when conditions so dictate.

Infrastructure

Issue:

Infrastructure limitations sometimes impair responsiveness to changing traffic and congestion conditions.

Needs:

  • Expanded detection and verification capabilities are needed across all transportation networks.

  • Expanded capabilities are needed to deliver traveler information to customers.

  • Partner agencies need to be able to assess corridor-specific performance.

3.9 Potential for ICM in the I-270 Corridor

The I-270/Montgomery County Corridor consists of the following independent networks:

The corridor is exceptionally ”directional,” connecting most commuters with their work place locations in Washington D.C., Northern Virginia, or Montgomery County itself.

During non-rush hour periods, I-270 often has sufficient capacity. However, during rush hour, the commuter volume routinely exceeds capacity. This is due, in large part, to the fact that traffic cannot leave the corridor (southbound in the morning and northbound in the evening) due to capacity limitations on the Capital Beltway and bottlenecks (reduction of the number of lanes from 6 to ultimately 2) in Frederick County. Commuters entering the corridor from the north do not have many choices in terms of alternate routes. The main roadways are I-270 and MD-355, which run parallel to each other.

Alternatively, commuters can choose to use the MARC commuter train or the WMATA Metro Rail system. Because the MARC commuter train makes only a few stops in the corridor, commuters who do not work directly at those stations need to switch to either Metrorail or bus. The Metrorail system has multiple stops serving many commuters, but it only starts at Shady Grove, which is roughly halfway down the corridor. This means that commuters using Metrorail either drive or bus to the rail stations. Those who drive to the Metro stations must first park before accessing the rail system.

Nearly everyday, unplanned events, notably incidents within or outside the corridor, have profound impacts on transportation conditions in the corridor, frequently producing large-scale travel delays, secondary incidents, etc. Of course, this produces frustration and can impact the area’s economic competitiveness, particularly when the congestion in the corridor is perceived as systemic.

The I-270 Corridor stakeholders have worked for many years to address these transportation challenges. These stakeholders have learned that through careful, structured coordination, adverse transportation conditions can often be most effectively and efficiently managed.

3.10 I-270 Corridor Vision

In the future, transportation operations within the I-270/Montgomery County Corridor function at peak efficiency by optimizing use of the capacities of the different transportation modes within the corridor. Key technology systems and decision-support tools within the corridor are interoperable and real-time information on road and traffic conditions is commonly exchanged among the corridor’s managing partners and stakeholders. Operational strategies within the corridor are routinely adjusted in response to changing corridor conditions. Strategic management of the corridor emphasizes multi-modalism and commuters have flexible access to real-time transit and parking lot information. Travelers are apprised of current road surface, traffic, and transit conditions — pre-trip and en-route; this information is then used to make informed travel and routing decisions. Performance metrics are employed across the corridor to assess variations in efficiency and safety benchmarks, refine the existing approaches, and formulate and deploy follow-on operational strategies.

4. ICM SYSTEM OPERATIONAL CONCEPT

This section describes the ICM operational concept for the I-270/Montgomery County Corridor.

4.1 Corridor Goals and Objectives

To achieve the corridor-wide vision enunciated in Section 3.10, I-270 Corridor Vision, four ICM goals were identified, as follows:

These goals emerged from an analysis of corridor needs as documented in Section 3.8, Corridor Issues and Needs. The issues and needs were prioritized according to such factors as (1) the level of improvement in transportation conditions that could potentially be realized if the need was addressed, (2) the speed at which the need could reasonably be addressed, and (3) the ease with which the need could be mitigated. Goals intended to address the priority needs were then identified.

Table 4-1, below, defines the four goals and specifies the objectives associated with each.

Table 4-1. I-270/Montgomery County Corridor Goals and Objectives for ICM

Goals

Objectives

Optimize Mobility, Reliability, and Safety: Achieve the highest practical levels of mobility through the corridor. Maximize mobility and minimize delays associated with incidents and other non-recurring conditions. Make the travel experience more predictable and reliable so that day-to-day fluctuations in travel times are less extreme. Optimized performance, with less volatility and reduced exposure to adverse conditions, will affirmatively impact safety.


  • Reduce overall trip and person travel-time.

  • Improve travel predictability and reliability.

  • Lessen the probability of secondary crashes by responding expeditiously to incidents.

  • Maximize inter-modal activity.

  • Empower customers to make intelligent travel choices.

  • Measure, monitor, and assess performance.

Strengthen Corridor-Level Decision Support: Upgrade the information-exchange infrastructure to more rapidly put comprehensive, fact-based information on incidents and roadway conditions into the hands of responders, traffic managers, and other stakeholders. Furnish tools to stakeholders to support adept decision-making that results in faster, more efficient response and clearance.

  • Optimize identification of incidents and adverse conditions.

  • Enhance the exchange of accurate, timely information among partners.

  • Emphasize corridor management and decision-making based on data and factual circumstances.

  • Improve rapid response to changing traffic, incident, and weather conditions.

Enhance the Dissemination of Reliable, Real-Time Information to Customers: The precepts here are two-fold: (1) travelers deserve to be informed about roadway/transit conditions and circumstances; and (2) as travelers are kept apprised of conditions, they will be able to make intelligent choices and thereby become active agents in optimizing mobility.

  • Expand and standardize the types of information available to travelers.

  • Emphasize dissemination of real-time conditions and status data across modes.

  • Furnish adequate information to travelers so they can make informed decisions on routing, modal shifts, etc.

Promote Multi-Modalism: Encourage reductions in the volume of vehicles traversing the corridor by making transit and carpooling more attractive to customers. Even for those travelers who are loathe to abandon single-occupant vehicle travel permanently, encourage ad hoc shifts to alternative modes when conditions warrant.

  • Emphasize bus and rail as practical alternatives to roadway travel.

  • Promote park-and-riding and park-and-carpooling.

  • Simplify inter-modal transfers.

Note the keen interrelationships among the four goals and their associated objectives. For instance, the second, third, and fourth goals, if successfully accomplished, will contribute positively to mobility (Goal 1). Similarly, expanded use of alternative travel modes, notably transit (Goal 4), will hinge, in large part, on the ability to communicate timely and reliable transit information to travelers.

Table 4-2, on the following pages, examines the relationships between the corridor needs, identified in Section 3.8, Corridor Issues and Needs, and the ICM goals identified above. The needs are organized by the five operations areas previously identified. Additionally, distinctions are drawn between primary and secondary corridor needs. “Primary” needs, those that are asterisked (*), are those needs expected to be addressed in this ICM effort. “Secondary” needs are also important, but are not planned for redress during the initial ICM activities.

Table 4-2. Relationship Between I-270 ICM Corridor Needs and Goals

Corridor Needs

Optimize Mobility, Reliability, and Safety


Strengthen Corridor-Level Decision Support


Enhance Reliable, Real-Time Information to Customers


Promote Multi-Modalism


Incident and Emergency Management

Stakeholder agencies — both highway and transit — need clearly articulated roles, responsibilities, and procedures for coordinated management and response to incidents and conditions in the corridor.*



Agencies need concrete plans for diverting traffic from freeways to arterials.*

o

Agencies need innovative, synergistic, and multi-modal approaches to managing incidents and congestion.*

Agencies need to detect and verify incidents quickly and efficiently.*

o


Agencies need mechanisms and procedures for sharing information on incidents and conditions.*

o


Agencies need tools and procedures that optimize operational decision-making.*



Agencies need metrics for measuring and assessing performance and conditions in the corridor, both on freeways and arterials.*

o



Traffic Signals

Traffic signals on arterials along the corridor need to be able to respond instantly to changing traffic conditions.*




Traffic signals need to be able to respond to changing conditions both on the affected arterials and adjacent roadways, including I-270.*




Before signal systems are modified, determination is needed regarding optimal signalized responses under alternative scenarios.*



Traffic signal prioritization for emergency vehicles is desirable.




Transit and Commuter Management

Commuters need reliable transit information and services.*


Commuters need on-demand access to rail/bus schedules and rail/bus real-time status.*



Commuters need on-demand access to information comparing travel times by automobile and transit in real-time.*

o


Commuters need to know where available parking spaces in commuter lots are located.*



Commuters need easy and convenient access from commuter lots to Metrorail and MARC stations.*




An infrastructure that encourages unplanned automobile commuter shifts to transit, when conditions warrant, is desirable.*




Commuters desire broader, more integrated usage of “smartcards” in the corridor.*




Use of HOV lanes needs to be made easier and more convenient.


o


Traveler Information

Travelers need access to accurate, reliable, and multi-modal travel information, both pre-trip and en-route.*



Travelers need travel conditions information in sufficient detail that they can make “smart” decisions about staying the course, selecting alternate routes, shifting travel modes, skipping or postponing travel, etc.*

o


o

Travelers need information about alternative routes/modes when conditions so dictate.*

o



Infrastructure

Expanded detection and verification capabilities are needed across all transportation networks.*

o


Expanded capabilities are needed to deliver traveler information to customers.*

o



Partner agencies need to be able to assess corridor-specific performance.*

o

* = Primary Need • = Goal Directly Addresses Need o = Goal Indirectly Addresses Need

Stakeholders along the corridor were meticulous about distinguishing between primary and secondary needs. The topic of improved car-sharing opportunities is illustrative of these deliberations. HOV lanes are an essential feature of the current I-270 landscape; there are also times during typical rush-hour periods that the lanes are underutilized. Why not, then, identify strategies for increasing HOV-lane usage? The answer is that key decision makers do not perceive much potential for increased HOV utilization, at least in the short-term. For one thing, commuters along I-270 begin and end their trips at different points along and beyond the corridor — unlike other corridors, there are few logical population centers and staging areas on I-270 for the large-scale formulation of carpools. For another, many AM commuters are traveling southward on I-270 and continue on the Capital Beltway — at present, the Beltway has no HOV lanes, so even carpoolers must often wade through bumper-to-bumper traffic. Additionally, some I-270 commuters find it difficult and stressful to navigate their way out of the HOV lanes when it is time to exit.

For these and other reasons, key I-270 stakeholders concluded that expending significant ICM resources on HOV activities would not be especially productive and counseled against it. Opportunities, conditions, policies (e.g., adoption of HOT lane strategies), etc. could, of course, change in the future and compel reclassification of HOV utilization as a primary need.

4.2 ICM Framework

The I-270/Montgomery County Corridor is a mature corridor that is generally well-managed. The corridor — particularly the interstate — is outfitted with a respectable network of detection devices, cameras, and variable message signs. The transportation corridor is unusual in that it does not stretch from a bedrock suburban community into a traditional urbanized region. Rather, it is a highly decentralized corridor that moves commuters to a range of destination centers along the corridor itself, but also to additional wide-ranging destinations in Maryland, Virginia, and Washington, D.C. During rush hour periods, the corridor often functions at the cusp of its capacity limits, with congestion rampant and vehicles plodding along, but no place to go.

With these conditions as a backdrop, the general framework for ICM system deployment in the corridor may be summarized as follows:

In other words, the contemplated framework is to build the ICM infrastructure using operations initiatives already underway in and around the I-270 Corridor. These concepts are further elaborated on below.

4.3 ICM Approaches

Five specific ICM approaches, all building on existing initiatives in the corridor or the surrounding metropolitan Washington, D.C. region, are anticipated:

These approaches are not new or groundbreaking, but instead build on efforts already underway in the corridor, and synthesize these efforts into a cohesive ICM framework that is realistic and effective.

The five approaches are briefly profiled below.

4.3.1 Prototype and Deploy Enhanced RITIS

Status

ICM Plan

Utility

Inputs

Outputs

4.3.2 Optimize Traffic Signals on Arterials

Status

ICM Plan

Utility

Inputs

Outputs

4.3.3 Deliver CAD/AVL Status Information to Transit Users

Status

ICM Plan

Utility

Inputs

Outputs

4.3.4 Deliver Parking Availability Information to Commuters

Status

ICM Plan

Utility

Inputs

Outputs

4.3.5 Measure Operations Performance

Status

ICM Plan

Utility

Inputs

Outputs

4.4 Application of ICM Approaches and Strategies

Table 4-3, below, identifies specific operational strategies associated with each of the five ICM approaches enumerated above. Most of the strategies have been custom-defined specifically for the I-270 Corridor requirements.

Table 4-3. Proposed ICM Approaches and Strategies for the I-270 Corridor

Prototype and Deploy Enhanced RITIS

  • Prepare/update corridor incident response plans.

  • Establish publish/subscribe connections with key corridor stakeholders.

  • Automate real-time information-sharing among corridor stakeholders.

  • Provide real-time, corridor-based traveler information to media and other ATIS providers via the Web and direct data feeds.

  • Provide real-time corridor traveler information, including transit, to travelers via the Web, 511, mobile devices, and in-vehicle devices.

  • Provide real-time information to agencies to aid in decision support.

  • Archive corridor transportation, traffic, transit, and incident response data for performance measurement.

Optimize Traffic Signals on Arterials

  • Develop operational strategies, responses, and procedures.

  • Enable automated traffic-responsive and traffic-adaptive operation of signals.

  • Include enhanced capabilities such as potentially providing priority to Ride On and Metrobus.

  • Evaluate performance of the Traffic Signal System and arterial operations through the collection and processing of current information on systems performance.

Deliver CAD/AVL Status Information to Transit Users

  • Define CAD/AVL information procedures and protocols.

  • Integrate the CAD/AVL system on WMATA buses with the system on Ride On buses.

  • Build on the integrated system to provide automated information-sharing on bus and train locations between WMATA and Ride On.

  • Use AVL data to furnish real-time transit information to travelers, including bus location, next bus/train arrival time, bus/train schedules, etc.

  • Use AVL data for bus schedule adherence evaluation.

Deliver Parking Availability Information to Commuters

  • Define parking availability information procedures and protocols.

  • Expand ongoing pilot projects in the corridor to additional parking lots.

  • Disseminate real-time parking space availability to travelers at remote locations using DMS, mobile phones and other personal information devices, Web sites, etc.

  • Publicize these measures to encourage park-and-ride in the corridor.

Measure Operations Performance

  • Identify parameters and procedures for assessing performance from CHART and RITIS.

  • Expand measures to include other factors (e.g., transit).

  • Gather pertinent data and archive in RITIS.

  • Analyze data to assess performance.

  • Disseminate performance findings to stakeholders.

Table 4-4, below, compares the relationship between the ICM operational strategies, above, and the I-270 Corridor goals previously identified.

Table 4-4. Relationship between I-270 ICM Operational Strategies and Corridor Goals

Strategies

Optimize Mobility, Reliability, and Safety

Strengthen Corridor-Level Decision Support

Enhance Reliable, Real-Time Information to Customers

Promote Multi-Modalism

Prototype and Deploy Enhanced RITIS

Prepare/update corridor incident response plans.




Establish publish/subscribe connections with key corridor stakeholders.

o

o


Automate real-time information sharing among corridor stakeholders.

o



Provide real-time corridor based traveler information to media and other ATIS providers via Web and direct data feeds.


Provide real-time corridor traveler information, including transit, to travelers via Web, 511, mobile devices, and in-vehicle devices.

o

Provide real-time information to agencies to aid in decision support.

o



Archive corridor transportation, traffic, transit, and incident response data for performance measurement.

o



Optimize Traffic Signals on Arterials

Develop operational strategies, responses, and procedures.



Enable automated traffic responsive and traffic adaptive operation of signals.

O



Include enhanced capabilities such as potentially providing priority to Ride On and Metrobus.



Evaluate performance of the Traffic Signal System and arterial operations through collection and processing of current information on system performance.

O



Deliver CAD/AVL Status Information to Transit Users

Define CAD/AVL information procedures and protocols.



Integrate CAD/AVL system on the WMATA buses running in the corridor with the Ride On system.


o

o

Build on the integrated system to provide automated information sharing about the location of transit buses and rail.

o


o

Use AVL data to furnish real-time transit information to travelers, including bus location, next bus/train arrival time, bus/train schedules.

o


Use AVL data for bus schedule adherence evaluation.




Deliver Parking Availability Information to Commuters

Define parking availability information procedures and protocols.



o

Expand ongoing pilot projects in the corridor to additional parking lots.

o


o

Disseminate real-time parking space availability to travelers at remote locations using DMS, mobile phones and other personal information devices, Web sites, etc.

o

o

Publicize these measures to encourage park- and-ride in the corridor.



o

Measure Operations Performance

Identify parameters and procedures for assessing performance from CHART and RITIS.




Expand measures to include other factors (e.g., transit)



o

Gather pertinent data and archive in RITIS.

o




Analyze data to assess performance.

o

o



Disseminate performance findings to stakeholders.



• = Goal Directly Addresses Strategy o = Goal Indirectly Addresses Strategy

4.5 ICM Concept Asset Requirements and Needs

This section identifies the assets required for a successful implementation of ICM for the I-270 Corridor based on approaches and strategies described in the Section 4.2, Application of ICM Approaches and Strategies. Tables in this section list both (1) the existing assets in the corridor, and (2) the planned assets expected to be required in the future for the ICM initiative to function efficiently. The ICM requirements are organized by the following categories:

Table 4-5. I-270 Corridor Market Packages

Market Packages

  • Network/Probe Surveillance

  • Surface Street Control

  • Freeway Control

  • Traffic Information Dissemination

  • Traffic incident Management

  • Traffic Forecast & Demand Management

  • Emissions Monitoring / Management

  • Parking Facility Management

  • Roadway Closure Management

  • Transit Vehicle Tracking

  • Transit Fixed Route Operations

  • Transit Passenger and Fare Management

  • Transit Traveler Information

  • ISP Traveler Information (broadcast, interactive, route guidance)

  • HAZMAT Management

  • Emergency Routing

  • Emergency Call Taking and Dispatch Roadway Service Patrols

  • Transportation Infrastructure Protection

  • Early Warning

  • Wide Area Alert

  • Disaster Response & Recovery

  • Evacuation & Re-Entry Management

  • Disaster Traveler Information

  • ITS Data Mart/Warehouse

  • Maintenance/Construction Vehicle & Equipment Tracking

  • Road Weather Data Collection

  • Weather Information Processing and Distribution

  • Work Zone Management

  • Maintenance & Construction Activity Coordination

  • Other (e.g., Asset Management System)

Table 4-6. I-270 Corridor Communications Infrastructure

Communications Subsystems

  • Center-to-Center Communications

  • Center-to-Field Communications

  • Roadside-to-Vehicle Communications

  • Center-to-Vehicle Communications

  • ITS Standards for Data Formats and Data-Transfer Functions

  • Video Transmission Standards (digital, analog)

  • Voice Communications

  • Capacity for Data Distribution

  • Capacity for Video Distribution

  • Capacity/Frequencies for Voice Communications (including interoperability)

  • Interfaces to Network Systems

  • Interfaces to Emergency Service Systems (CAD)

  • Interfaces to Proprietary/Legacy Systems

  • Interfaces to ISPs (data and video export)

  • Interfaces to Financial Transaction Network

  • Interfaces to Internet

  • Security Firewalls

Table 4-7. I-270 Corridor Asset Requirements

Operations Area

Network Subsystems and Technologies

Information/Data

Other Operational/Performance Assets

Incident and Emergency Management

  • Automated Incident Detection

  • Incident Detection (call-in, other)

  • Incident Reporting System (GIS, common display)

  • Emergency Vehicle Priority/Preemption (Intersection/Vehicles)

  • Service Patrol Vehicles

  • Montgomery County Traffic Monitoring Airplane

  • Event/Incident Information

    • Location

    • Type

    • Time

    • Number of vehicles

    • Lane closures

    • Responding agencies

  • Incident Status/Details

  • ETP & ERU Vehicle Location Data

  • Maintenance/Construction Events

  • Maintenance Vehicle Location

  • Incident Response Plans/Guidelines/Teams

  • Response Plans

  • Online Decision Support (for selecting response plans)

  • Definitions of Responsibilities of Agencies

  • Common Policies for Incident Reporting and Response

  • Accuracy of Data

  • Surveillance Coverage

  • Special Event Plans

Traffic Signals

  • Traffic Signal Control/Monitoring (TOD schedule)

  • Traffic Signal Control/Monitoring (traffic adaptive)

  • Traffic Signal Locations

  • Traffic Signal Status (Signal, phasing, timing plans, flashing, preemption, etc.)


  • Ability for Priority Logic at Intersections

Transit and Commuter Management

  • Parking Surveillance/Occupancy Equipment

  • Parking Payment Equipment

  • Transit Agency Operations Control Center

  • Transit Schedule Performance Monitoring

  • Passenger Counting Equipment

  • Electronic Fare-Collection Equipment (e.g., SmartCard)

  • Transit Public Address System

  • Transit Trip Planning System

  • Spare Transit Vehicles/Operators

  • Transit Priority Equipment (Intersection & Transit Vehicles)

  • Train Location and Schedule Adherence Tracking and Alert System

  • Detector Data

    • Link volumes

    • Link occupancies

    • Link/spot speeds from RTMS

    • Link travel times

    • Intersection approach volumes

    • Ramp queues

  • Average Vehicle Occupancy

  • Parking Space Availability

  • Parking Fees

  • Parking Equipment Status

  • Transit Schedules

  • Transit Vehicle Location

  • Schedule or Headway Status/Deviation

  • Transit Vehicle Headways

  • Link Travel Times

  • Priority Requests

  • Next Vehicle Arrival

  • Transit Fares

  • Average and Real-Time Vehicle Occupancy

  • Available Transit Vehicles/Location

  • Ridership Data

  • Maintenance Data

  • Device Status

  • Regional Parking Management (MP)

  • Multi-Modal Coordination (MP)

  • Information Exchange Network/Common displays for data entry/display

  • Regional/Sub-Regional ITS Architecture

  • Availability of Spare Network Capacity

  • Data Aggregation/Storage of Processed Data on RITIS for Subsequent Analysis

  • Corridor Models (simulation)

  • Common Fare-Collection Technology

  • Priority Logic at Intersections

Traveler Information

  • DMS on Freeway and Arterials

  • Internet Traveler Information

  • Telephone-Based ATIS (511)

  • Montgomery County Cable Television Station

  • DMS Location/Status

  • HAR Location/Status

  • Other Traveler Information Devices

  • Vehicle Location Accuracy

  • Corridor Agency Websites

  • Private Sector Websites

Infrastructure

  • ATMS Software

  • EORS Software

  • RITIS

  • Traffic Detectors/Roadway Surveillance/Vehicle Probes

  • CCTV (video surveillance)

  • Air-Quality Sensors

  • Road Weather Information Sensors

  • Public Safety CAD

  • Real-Time Conditions Data Base/Common Displays

  • Maintenance Vehicle Location (AVL/GPS)

  • Detector Locations

  • CCTV Locations

  • Electronic Toll/Fare/Parking Equipment

  • Video Images/Snapshots

  • Video Control

  • Contact Lists

  • Air Quality

  • Road Surface Conditions

  • Regional/Sub-Regional ITS Architecture

  • Vehicle Location Accuracy

  • Surveillance Coverage

  • Special Event Plans

  • System Back-Up/Disaster Recovery

It is informative to note that most of the above-mentioned assets are cross-cutting and there exist several interrelationships between the columns. For instance, roadway monitoring assets listed in the “Network Subsystems and Technologies” column, such as traffic detectors, CCTV, and road weather sensors, provide or generate the traffic characteristics, video detection data, weather data, etc. listed in the "Information/Data" column. Also, the items included in the "Communications Subsystems" table are necessary to technically integrate all of these systems and devices into a corridor-based system. The “Other Performance/Operational Assets" support the corridor-wide policy, coordination, operational, and institutional elements.

The priorities associated with these ICM assets are based on the primary needs and associated ICM corridor approaches addressed in Sections 4.6 and 4.7. For example, roadway monitoring devices that provide data to support the prototyping and deployment of RITIS gain precedence over air-quality monitoring assets, which is a support strategy for performance monitoring.

4.6 Comparison of ICM Concept Asset Requirements with Current and Potential Assets

Building on the discussion in Section 3 about the existing and planned assets in the corridor, Table 4-8, Table 4-9, and Table 4-10 show assets that already exist or are planned for the near-term in the corridor. The following codes are used:

Table 4-8. I-270 Corridor Market Packages

Market Packages

  • Network/Probe Surveillance

  • Surface Street Control

  • Freeway Control

  • Traffic Information Dissemination

  • Traffic Incident Management

  • Traffic Forecast & Demand Management

  • Emissions Monitoring/Management

  • Parking Facility Management

  • Roadway Closure Management

  • Transit Vehicle Tracking

  • Transit Fixed Route Operations

  • Transit Passenger and Fare Management

  • Transit Traveler Information

  • ISP Traveler Information (broadcast, interactive, route guidance)

  • HAZMAT Management

  • Emergency Routing

  • Emergency Call Taking and Dispatch Roadway Service Patrols

  • Transportation Infrastructure Protection

  • Early Warning

  • Wide Area Alert

  • Disaster Response & Recovery

  • Evacuation & Re-Entry Management

  • Disaster Traveler Information

  • ITS Data Mart/Warehouse

  • Maintenance/Construction Vehicle & Equipment Tracking

  • Road Weather Data Collection

  • Weather Information Processing and Distribution

  • Work Zone Management

  • Maintenance & Construction Activity Coordination

  • Other (e.g., Asset Management System)

Table 4-9. I-270 Corridor Communications Infrastructure

Communications Infrastructure

  • Center-to-Center Communications

  • Center-to-Field Communications

  • Roadside-to-Vehicle Communications

  • Center-to-Vehicle Communications

  • ITS Standards for Data formats and Data-Transfer Functions

  • Video Transmission Standards (digital, analog)

  • Voice Communications

  • Capacity for Data Distribution

  • Capacity for Video Distribution

  • Capacity/Frequencies for Voice Communications (including interoperability)

  • Interfaces to Network Systems

  • Interfaces to Emergency Service Systems (CAD)

  • Interfaces to Proprietary/Legacy Systems

  • Interfaces to ISPs (data and video export)

  • Interfaces to Financial Transaction Network

  • Interfaces to Internet

  • Security Firewalls

Table 4-10. I-270 Corridor Asset Requirements

Operations Area

Network Subsystems and Technologies

Information/Data

Other Operational/Performance Assets

Incident and Emergency Management

  • Automated Incident Detection

  • Incident Detection (call-in, other)

  • Incident Reporting System (GIS, common display)

  • Emergency Vehicle Priority/Preemption (Intersection/Vehicles)

  • Service Patrol Vehicles

  • Montgomery County Traffic Monitoring Airplane

  • Event/Incident Information

    • Location

    • Type

    • Time

    • Number of vehicles

    • Lane closures

    • Responding agencies

  • Incident Status/Details

  • ETP & ERU Vehicle Location Data

  • Maintenance/Construction Events

  • Maintenance Vehicle Location

  • Incident Response Plans/Guidelines/Teams

  • Response Plans

  • Online Decision Support (for selecting response plans)

  • Definitions of Responsibilities of Agencies

  • Common Policies for Incident Reporting and Response

  • Accuracy of Data

  • Surveillance Coverage

  • Special Event Plans

Traffic Signals

  • Traffic Signal Control/Monitoring (TOD schedule)

  • Traffic Signal Control/Monitoring (traffic adaptive)

  • Traffic Signal Locations

  • Traffic Signal Status (Signal, phasing, timing plans, flashing, preemption, etc.)


  • Ability for Priority Logic at Intersections

Transit and Commuter Management

  • Parking Surveillance/Occupancy Equipment

  • Parking Payment Equipment

  • Transit Agency Operations Control Center

  • Transit Schedule Performance Monitoring

  • Passenger Counting Equipment

  • Electronic Fare-Collection Equipment (e.g., SmartCard)

  • Transit Public Address System

  • Transit Trip Planning System

  • Spare Transit Vehicles/Operators

  • Transit Priority Equipment (Intersection & Transit Vehicles)

  • Train Location and Schedule Adherence Tracking and Alert System

  • Detector Data

    • Link volumes

    • Link occupancies

    • Link/spot speeds from RTMS

    • Link travel times

    • Intersection approach volumes

    • Ramp queues

  • Average Vehicle Occupancy

  • Parking Space Availability

  • Parking Fees

  • Parking Equipment Status

  • Transit Schedules

  • Transit Vehicle Location

  • Schedule or Headway Status/Deviation

  • Transit Vehicle Headways

  • Link Travel Times

  • Priority Requests

  • Next Vehicle Arrival

  • Transit Fares

  • Average and Real-Time Vehicle Occupancy

  • Available Transit Vehicles/Location

  • Ridership Data

  • Maintenance Data

  • Device Status

  • Regional Parking Management (MP)

  • Multi-Modal Coordination (MP)

  • Information Exchange Network/Common displays for data entry/display

  • Regional/Sub-Regional ITS Architecture

  • Availability of Spare Network Capacity

  • Data Aggregation/Storage of Processed Data on RITIS for Subsequent Analysis

  • Corridor Models (simulation)

  • Common Fare-Collection Technology

  • Priority Logic at Intersections

Traveler Information

  • DMS on Freeway and Arterials

  • Internet Traveler Information

  • Telephone-Based ATIS (511)

  • Montgomery County Cable Television Station

  • DMS Location/Status

  • HAR Location/Status

  • Other Traveler Information Devices

  • Vehicle Location Accuracy

  • Corridor Agency Websites

  • Private Sector Websites

Infrastructure

  • ATMS Software

  • EORS Software

  • RITIS

  • Traffic Detectors/Roadway Surveillance/Vehicle Probes

  • CCTV (video surveillance)

  • Air-Quality Sensors

  • Road Weather Information Sensors

  • Public Safety CAD

  • Real-Time Conditions Data Base/Common Displays

  • Maintenance Vehicle Location (AVL/GPS)

  • Detector Locations

  • CCTV Locations

  • Electronic Toll/Fare/Parking Equipment

  • Video Images/Snapshots

  • Video Control

  • Contact Lists

  • Air Quality

  • Road Surface Conditions

  • Regional/Sub-Regional ITS Architecture

  • Vehicle Location Accuracy

  • Surveillance Coverage

  • Special Event Plans

  • System Back-Up/Disaster Recovery

As discussed in the earlier sections of this document, I-270 is a mature corridor. Many of the assets required for ICM are already deployed or are in the process of being deployed. This corroborates the ICM “framework” described previously, which builds on the existing infrastructure and initiatives in the region, such as RITIS. Several initiatives — e.g., the Ride On CAD/AVL system upgrade and the Montgomery County Traffic Signal deployment — are moving forward quite satisfactorily, but without benefit of a corridor-wide focus. ICM is an important opportunity for stakeholders to integrate these deployments for the benefit of the entire I-270 Corridor.

Table 4-11, below, summarizes the key changes and additions to the I-270 Corridor needed to accommodate the ICM plan as conceptualized in this document. Each item’s projected completion date or strategy is included in parentheses.

Table 4-11. Summary of Significant Changes and Additions to the I-270 Corridor

Network

Stakeholder

Changes and Additions

Freeway Network

Maryland State Highway Administration (MDSHA)

  • Additional DMS on I-270 (2010).

  • Additional detectors along I-270 to collect volumes, speeds, and travel time (2010).

  • Additional CCTV along I-270 (2010).

  • Additional two-way communications linkages between Montgomery County and CHART to support video-sharing and other incident-related data (2008).

  • Interface with RITIS for providing and extracting real-time information (2007).

  • Interface with RITIS for extracting archived data for performance analysis and evaluation (2008).

  • Decision-support software (2010).

  • Access to a Corridor Simulation Model (2009).

Arterial Network

Montgomery County Department of Public Works and Transportation (DPWT)

  • Additional DMS on arterials (2010).

  • Additional detectors along arterials to collect volumes, speeds, and travel time (2010).

  • Additional CCTV along arterials (2010).

  • Additional two-way communications linkages between Montgomery County and CHART to support video-sharing and other incident-related data (2008).

  • Decision-support software as part of the signal system upgrade. (Mid-2009)

  • Interface with RITIS for providing and extracting real-time information (2008).

  • Access to a Corridor Simulation Model (2009).

  • Interfaces with existing corridor-wide systems (2008).

  • Adaptive signal control system. (Central System, mid-2009; Signal Controllers, 2009-2013, with corridor signals given priority.)

MARC Commuter Rail Network

Maryland Transit Administration (MTA)

  • Surveillance of park-n-ride lots at the stations for real-time monitoring of parking availability (2009).

  • Parking management software (2009).

  • DMS for parking information dissemination (2008).

  • Interface with RITIS for providing and extracting real-time information (2008).

Metrorail Network

Washington Metropolitan Area Transit Authority (WMATA)

  • Surveillance of park-n-ride lots at the five stations for real-time monitoring of parking availability (2009).

  • Parking management software (2009).

  • DMS for parking information dissemination (2009).

  • Interface with RITIS for providing and extracting real-time information (2008).

Metrobus Network

Washington Metropolitan Area Transit Authority (WMATA)

  • Interface with RITIS for providing and extracting real-time information (2008).

  • Integration with Ride On CAD/AVL system (2008).

  • CAD/AVL information dissemination system (2009).

  • Enhancements to CAD software to identify optimal routes (2010).

  • Interface to CAD, including protection/security of sensitive information (2009).

Ride On Network

Montgomery County Department of Public Works and Transportation (DPWT)

  • Interface with RITIS for providing and extracting real-time information (2008).

  • Information-sharing system with WMATA and MTA (2008).

  • CAD/AVL information dissemination system (2008).

  • Enhancements to CAD software to identify optimal routes (2009).

  • Interface to CAD, including protection/security of sensitive information (2009).

4.7 I-270 Corridor Concept Operational Description

The proposed operational enhancements to the I-270/Montgomery County Corridor are intended to improve the efficiency and reliability of travel along the corridor. The proposed project emphasizes the structured, routinized, integrated, and more unified sharing of information across stakeholder agencies, with a high level of focus on sharing information with customers. It is anticipated that this approach will enable the corridor to better plan for, and respond to, recurring and non-recurring congestion; to enable the corridor to function more efficiently and react more effectively to changing traffic and transit conditions — subject, of course, to the physical capacity limits of the corridor’s transportation infrastructure.

The stakeholder agencies within the I-270 Corridor already operate and maintain their assets in an efficient manner, but interagency coordination can be improved. The existing management center facilities operated by each of the stakeholder agencies will be retained as the focal point for managing the stakeholder-specific assets, but a data- exchange software package, RITIS, will be deployed in the corridor. The RITIS system is ultimately going to be deployed in the entire Washington, D.C. metropolitan area, with the I-270 Corridor proposed for initial pilot deployment of the system. RITIS will provide data-collection, data archiving, and data-exchange capabilities, including automated alarm notifications for incidents, etc. Currently, incident notification in the corridor is taking place via non-automated means, such as phone or e-mails. As part of the interagency agreements, each stakeholder agency will retain its ability to initiate new projects, but will coordinate said projects with the other stakeholders.

The daily operation of the corridor under ICM will remain similar to the current operations executed by each stakeholder agency. However, each agency’s system will have an interface to RITIS, which will allow the automatic input of relevant data. RITIS, in turn, will automatically provide each agency’s system with information regarding the operational status of the assets from other agencies. This will be particularly helpful in managing non-recurring conditions because each agency will immediately be aware of problems in the corridor that could potentially affect its operations. In this way, RITIS will act as the coordination system within the corridor, without compromising the operational and response capabilities assigned to each stakeholder agency.

Corridor response plans will be developed by a joint effort among all of the stakeholders and implemented within each agency. Once a notification or an alarm is initiated via RITIS, each agency will follow the agreed-upon corridor response plan and take action on the stakeholder-specific portions of the response plan. The responses executed by each agency will be reported back to RITIS and again disseminated to the other stakeholders. In preparation for real-life situations requiring the use of these corridor response plans, the stakeholder agencies will perform regular exercises to test, analyze, and fine-tune the corridor response plans. The stakeholder agencies will also meet at regular intervals in order to review these response plans based on real-life usage. Additionally, these meetings will provide a forum for assessing whether the performance metrics put in place as part of the ICM project are accurate and adequate. RITIS will support the generation of performance measures reports, which will be provided to the I-270 ICM Executive Steering Committee as well as each stakeholder agency on a regular basis.

As described earlier, the integration of the I-270 ICM corridor is designed to be done very quickly without requiring significant institutional modifications or major construction projects and be deployable within a short period of time. Consequently, the total integration of all systems and the rendering of control of field devices and other assets to a new transportation management facility is not envisioned for this project. Nevertheless, the deployment of RITIS will, in fact, create a real-time interface between all agencies to enable rapid response to changing conditions. Additionally, each stakeholder agency will maintain electronic lists of entities to be contacted during particular responses, in accordance with the corridor’s response plans. Voice, data, video, and information — but not field device control — will be provided to all agencies based on the adopted protocols and standards for the sharing of information and the distribution of responsibilities. Each agency will continue monitoring the travel conditions among its areas of responsibilities; if changing conditions so require, they will notify the other agencies via RITIS and deploy the corridor response plans and strategies.

Operationally, at any point in time, only one corridor response plan will be active, based on the real-world conditions in the corridor. For example, the information on a DMS (e.g., travel time estimates, parking availability data, information on conditions ahead, etc.) could typically be strictly informational. However, when a significant, non-recurring event occurs, instructions might shift from “advisory” to “directional”— e.g., use particular lanes because other lanes are blocked or severely restricted.

RITIS will link to existing (and potentially new) venues for disseminating information to the general public. The information is expected to be more comprehensive, reliable, and timely than are the data currently available. Motorists will be able to make smarter, better-informed decisions, both pre-trip and en-route. In particular, travelers will have access to information that may make usage of transit services more attractive to them — e.g., information on next buses, location of available parking spaces, comparative travel times by automobile versus rail, etc. Additionally, commuters who generally travel by private vehicle will be encouraged to consider transit when conditions grow exceptionally bad.

As envisioned here, the I-270 Corridor will function as an integrated transportation system to benefit travelers and users, even though individual assets will still be managed by the respective stakeholder agencies. From the vantage point of travelers, the corridor will be perceived as a seamless transportation network, providing them with multiple viable alternatives that can be selected according to their own personalized travel circumstances and needs.

4.8 Alignment With Regional ITS Architecture

A high-level comparison of the I-270 Corridor ICM concept has been made to the Regional ITS Architecture. The findings are summarized below:

Based on current plans, the ICM concept is consistent with the Maryland Statewide ITS Architecture. There are no conflicts, per se; but the RITIS deployment portion of the ICM system does not exist by name in the MD ITS Architecture; functionally, it is a combination of the elements “Archived Data Management Centers“ and “CapCom.”

Assuming the I-270 Corridor concept is approved for deployment, Maryland’s ITS Architecture Conformity Form will be completed and the MD ITS Architecture conformity process will be initiated. It is expected this process will result in updates to the Maryland Statewide ITS Architecture to reflect the sub-regional ICM concept and RITIS deployment in the I-270 Corridor.

4.9 Implementation Issues

Deployment of the I-270 ICM concept is not dependent on major new infrastructure deployments or large-scale institutional changes. Consequently, monumental implementation issues are not anticipated. Nevertheless, some important issues and challenges will need to be addressed. For example, there are ”gaps” in the integrated approach to incident management. The proposed solution does not include a centralized approach to decision making and incident response, but via an agreed-upon approach with the RITIS system as the real-time data-exchange tool and via pre-defined roles, responsibilities, and procedures for each I-270 ICM stakeholder agency involved in incident response.

Management and operations, including device control, will remain in the hands of the agency currently responsible for each given function. However, procedures for the real-time exchange of information will need to be defined and improved. Corridor stakeholders will also need to refine and update their corridor response plans.

In order to achieve these goals, an institutional framework allowing the close coordination between agencies will have to be put in place. This institutional framework will need to span all stakeholders and cover all available transportation modes. This will also need to address the determination of authority for decision-making pertaining to transportation-related issues based on location, type of incident, etc. However, the I-270 ICM Steering Committee expects to maintain the current management infrastructure at each agency as it performs its roles and responsibilities. What will change is the way the stakeholders interface in order to improve the travel experiences of the roadway users, as well as providing said users with the travel information necessary to make appropriate decisions.

Table 4-12 highlights the major implementation and integration issues facing the I-270 ICM project and the proposed ICM concept. Additional discussion of some of these issues is offered below.

Table 4-12. I-270 ICM Implementation Issues

Note: Items in bold typeface are operational issues to be addressed in an Operations Plan and Manual prior to system implementation.

Technology Issues

Operational Issues

Institutional Issues

  • Integration of data into RITIS

    • Development of ”translators” to the existing ”legacy” systems.

    • Each agency’s existing system will require some modification to view RITIS information.

    • Not all participating agencies have the ability to, or do not reliably geo-locate incidents and events.

    • Configuration Management.

  • Development of a standardized interface into RITIS

  • Expanded CCTV coverage

  • Expanded DMS coverage

  • Expanded Data Collection locations and determination of their placement.

  • Creation of a common data collection frequency among all stakeholders.

  • Development of a unified approach to message displays on DMS.

  • Real-time calculation of Parking Availability at the various parking lots.

  • Sizing and managing a Communications System among stakeholders.

  • Real-time decision support (i.e., software-based response plan development/selection management tools).


  • Development of operational response plans for numerous corridor scenarios and events

  • Up-to-date data base of contact personnel and locations

  • Updates to network operational parameters (signal timing, transit schedules)

  • Identifying available data and other information to be shared between agencies (e.g., personal information on drivers involved in an incident as input to police CAD)

  • Policy towards route/modal shifts (i.e., Inform vs. Instruct), and under what scenarios

  • Procedures and protocols for identifying route/modal shifts when spare capacity exists on multiple networks

  • Policies for implementing route/modal shifts when sufficient spare capacity is not available within the corridor

  • Policies for implementing demand/capacity management strategies

  • Common policies for incident response & reporting

  • Disseminating traveler information in a consistent manner across networks

  • Video distribution/censoring policy

  • Safety concerns

  • Corridor modeling (e.g., evaluate impact of strategies and operating parameters)

  • Corridor-wide performance measures and metrics

  • Marketing and outreach

  • Ongoing operations and maintenance of the ICM system

  • Request by some stakeholders to customize and filter RITIS data.

  • Identification and distribution of responsibilities (e.g., lead, support roles) for the shared ICM activities

  • Hosting of ICM hardware

  • Organizational and administrative framework/structure that supports ICM operations and coordination

  • Policy arrangements for ICM activities and funding

  • ICM funding mechanisms

    • It has not yet been determined how RITIS will be funded, operated, and maintained.

  • System procurement/ implementation approach

  • Policies and procedures for data sharing, access rights, filtering, etc.

  • Inter-agency liability

  • Policies and arrangements with private entities (e.g., parking, ISP, etc.)

  • Federal involvement

  • Inter-agency agreements documenting the resolution of the various operational, technical, and institutional issues

  • Updating the agreements

Technology Issues

The technology issues italicized in Table 4-12 have already been addressed, albeit at a high level, in this I-270 ICM Concept of Operations. The need for additional surveillance capabilities and information (e.g., freeway off-ramps, additional CCTV coverage, additional DMS coverage at decision points, and parking lot determination of available spaces) has also been identified. The technical details, such as the distribution and actual location of the devices and their respective capabilities, will be addressed during the Requirements and Design stages of the I-270 ICM project. And while the role of purchasing additional field devices will remain with the individual stakeholder agencies, the I-270 ICM stakeholder agencies have recognized and are subscribing to the use of ITS standards as interfaces into the field devices to the extent possible (not all field devices utilized are available with NTCIP interfaces). This understanding will influence future purchasing decisions.

Assuming a common system would be deployed that relies on common interfaces, it will be essential that all data elements exchanged between the different software central systems operated by the I-270 ICM stakeholders be defined in exactly the same way; that there be perfect understanding between the interfaced centers as to the meaning of these data — both status and control information. However, the development of RITIS is going to provide interfaces to the various, diverse software packages, so the use of ITS standards for the RITIS system will be essential. Independent of developing any shared or central components for the network, providers will need to publish event data in a consistent and known format that can be used by all providers (or at least a format that RITIS can translate). RITIS follows XML, NTCIP, traffic management data dictionary, and other industry standards. This standard interface will be based on center-to-center communications protocols such as:

RITIS will provide translation back and forth between existing systems and NTCIP standards. The I-270 ICM project will need to develop regional incident naming and classification standards. Agreement on data standards will allow data to be placed in its proper location in a message rather than in the narrative descriptive portion of the message. This will greatly enhance the system usability, and allow for ease of data sorting and filtering. The I-270 ICM stakeholders as well as the developers of the RITIS system do understand that there will likely be interoperability problems, in part due to the fact that the ITS Center-to-Center data dictionaries have overlaps in terms of data elements and messages. This might create problems, if it were not for the fact that RITIS will provide a standard interface to which each of the stakeholder systems will have to comply. Appropriate descriptions of the RITIS standard interface will be provided, including definitions of the utilized data elements, messages, and, very importantly, the dialogs (sequences of how one system is supposed to respond to the requests by another system).

RITIS will include “filters” to avoid releasing sensitive information to non-authorized information outlets. The sharing of video images will be part of the RITIS system in that all connected stakeholders will be able to view the images from all agencies along the I-270 Corridor; however, the control of PTZ commands will remain with the “owning” stakeholder agency.

As noted in the I-270 ICM application, several of the stakeholder agencies have implemented ITS standards such as the NTCIP standard for DMS communications and they will continue requiring the use of those standards. However, those required uses are stakeholder-specific.

Operational Issues

The operational issues must be resolved prior to system implementation if the proposed I-270 ICM strategies are to be applied consistently, efficiently, and in a manner that improves overall corridor performance. The I-270 ICM stakeholders are aware that an Operations Plan and Manual needs to be developed during the system design phase. At a minimum, this Operations Plan will address those issues presented in bold type in Table 4-12. This plan will also serve as the basis for the I-270 ICM Operations and Maintenance Plan as described in the ICM Implementation Guidance.

Some of these operational issues have already been resolved, as the stakeholders have agreed that decisions for any modal shifts will be placed in the hands of the users; i.e., a motorist will be supplied with the information to make a decision, but not instructed to do so. The exception would be to provide detour information during major incidents that require road closures, or other major events and emergencies.

Providing motorists with effective and accurate information is crucial to the success of the I-270 ICM concept. Some of the technical issues associated with data gathering (e.g., surveillance coverage and types of information) and aggregation have already been noted. The associated operational issue involves the presentation of the information in a consistent manner across networks such that the motorists can make informed decisions regarding travel decisions (e.g., route, mode, and time-of-day). One of the proposed approaches will be the provision of travel conditions at decision points to provide motorists with the decision-making information, particularly travel times using one or another travel mode choice. Another approach includes the continuous provision of a congestion map, which already exists within the CHART software, but which will need to be expanded to include the primary arterials in the I-270 Corridor.

Another key operational issue is the development of operational response plans for numerous corridor scenarios and events, including location(s) of events, severity and impact, associated strategies (e.g., DMS messages, other traveler information displays, system operational parameters), contact personnel and locations, other resources, and implementation rules. The I-270 ICM Response Plans will be developed during I-270 ICM implementation, and then evaluated and updated throughout the project's life. Each stakeholder agency will have these developed I-270 ICM Response Plans available within their agencies and, based on established and agreed-upon threshold parameters and procedures, will initiate these plans.

Institutional Issues

Resolving outstanding institutional issues is an on-going process of coordination and collaboration between corridor stakeholder agencies. However, this process has already been initiated by establishment of the I-270 ICM Executive Steering Committee, the larger I-270 ICM stakeholder meetings, and the development of this ICM ConOps.

The next section describes the proposed institutional framework to support the management, operation, and administration of the I-270 ICM Corridor.

4.10 ICM Corridor Institutional Framework

This section describes the proposed institutional framework by which the I-270 ICM concept will be implemented, operated, managed, and maintained. The goal for institutionalizing an I-270 ICM structure will be to utilize established regional frameworks instead of creating an entirely new structure. The benefits of weaving the I-270 ICM initiative into the fabric of the current regional ITS, operations, and management institutional frameworks are significant:

Establishing an I-270 ICM Institutional Framework

Integrating the I-270 ICM institutional framework within the NCR will require a phased approach:

I-270 ICM Agency Responsibilities and Staffing

Ultimately, in Phase Three of the ICM institutional framework deployment, the management and operations of ICM initiatives will be a joint effort of all MATOC stakeholders. To accomplish this, the I-270 ICM Executive Steering Committee will work to establish a formal Integrated Corridor Management Subcommittee under MATOC (MATOC-ICMS) which will serve as a central decision-making body for ICM initiatives throughout the region. The MATOC-ICMS will be responsible for establishing the necessary inter-agency and service agreements, budget development, project initiation and selection, corridor operations policies and procedures, and overall administration. It is envisioned the MATOC-ICMS will be the ultimate regional institutional framework built upon the foundation of the I-270 ICM initiative. In the near term, the current I-270 ICM Executive Steering Committee will provide project oversight. Migration to Phase 2 of the I-270 ICM Institutional Framework under ROCC will take place over the course of the next year.

Projects resulting from the I-270 ICM initiative, and ultimately from the MATOC-ICMS, will be incorporated within the existing Metropolitan Area Regional ITS Architecture and will be coordinated through the existing Regional ITS Architecture subcommittee under MOITS. In addition, relevant portions of other regional architectures will be updated to include ICM-related projects.

In the near to mid-term, I-270 ICM partner agencies will provide the operational and technical staff (along with ITS consultants and contractors) to support deployment of ICM strategies in the I-270 Corridor.

4.11 Performance Measures and Targets

The agencies active in the I-270 Corridor already have in place several performance measurement methods, which will be leveraged on for the overall I-270 ICM project.

Beside maintaining the existing performance measures, which are needed for agency-internal processes, the I-270 ICM stakeholders have identified initial performance measures that will be used to determine the effectiveness of the proposed I-270 ICM framework, strategies, and operations as compared to the stated corridor goals and objectives. These baseline corridor performance measures are identified in Table 4-13. Note that these initial performance measures might be adjusted as new collection methods and processing techniques are deployed because the systems implemented in the corridor evolve and operational experience requires modifications to stakeholder’s standard operating procedures (SOPs).

Table 4-13. I-270 ICM Baseline Performance Measures and Targets

Goals

Candidate Performance Measures

Optimize Mobility, Reliability, and Safety

  • Average Travel Time under normal conditions.

  • Travel Time Index – a ratio of travel times in the peak period or other corridor condition to a target or acceptable travel time (typically free-flow/on-schedule conditions are used). The travel time index indicates how much longer a trip will take during a peak time.

  • Buffer Index – this measure expresses the amount of extra "buffer" time needed to be on-time 95 percent of the time (late one day per month). Travelers could multiply their average trip time by the buffer index, and then add that buffer time to their trip to ensure they will be on-time 95 percent of all trips. An advantage of expressing the reliability (or lack thereof) in this way is that a percent value is distance and time neutral.

Strengthen Corridor-Level Decision Support

  • Average Delay Per Trip – segregated by incident and event types (e.g., minor and major roadway incident, minor and major transit incident, weather, special event) for the corridor and each network

  • Incident Response Times, including:

    • Incident Detection Time (time between incident occurrence and incident detection).

    • Incident Response Time (time between incident detection and arrival at incident site).

    • Incident Clearance Time (time between arrival at incident site and incident clearance time).

  • Response/Clearance Times for Incidents (involving a single stakeholder).

  • Response/Clearance Times for Major Incidents (involving multiple stakeholders).

  • Time Required to Channel a Potential Evacuation.

  • Number of data exchanges between stakeholders in order to:

    • Detect, manage, and clear incidents, including weather-related incidents.

    • Share traveler information display information (both DMS and HAR).

    • Share information about parking space availability.

Enhance Reliable, Real-Time Information to Customers

  • Uniformity of messages across DMS’s within the corridor.

  • Number of "cross-network" messages displayed on all DMS’s.

  • Corridor-related ATIS Web site hits/511 calls.

Promote Multi-Modalism

  • Number of Corridor Customers switching travel modes based on available pre-trip and en-route information (estimation, determined via survey)

  • Average Parking Availability Per Facility Per Time-of-Day


Corridor Perspective

  • No specific quantitative measures for this ”virtual” goal.

  • The performance measures improvements associated with and attributed to the other goals will be a strong indication that this goal has been achieved.

The I-270 ICM project makes each stakeholder agency responsible to collect its data, which is going to get aggregated to a large extent into RITIS. One purpose of RITIS, as described in previous sections, is to archive data and to allow data mining for performance measuring purposes. The University of Maryland’s Transportation Center will function as both the provider of the corridor modeler and the developer (and subsequently the maintainer) of RITIS. Therefore, obtained data from the stakeholders will be fed into RITIS from where it can be used in the modeling of the corridor and for subsequent analysis, including determination of performance trends and updating of decision-support parameters. Findings will be provided back to the stakeholders for performance improvements.

Additionally, the stakeholders internally and in conjunction with each other will:

Based on the goals and objectives, the I-270 ICM project also identified “success” targets for some of the performance measures. (Please note that it is assumed that these performance “success” targets might be adjusted once the modeling of the corridor has commenced.) These "Performance Measures Success Thresholds," listed in Table 4-14, provide an indication whether the corridor goals have been achieved.

Table 4-14. Sample Potential Performance Measure Targets

Performance Measure

Sample Performance Measure Success Threshold

Average Travel Time (during rush hours)

  • Corridor – 45 minutes

  • Freeway – 45 minutes

  • Freeway HOV – 35 minutes

  • Arterials – 70 minutes

  • Metrorail (Red Line) – left out because already VERY reliably at 13 minutes, northern part of I-270 Corridor not covered by Metrorail

  • Metrobus – will be different for each line

  • Ride-On Bus – will be different for each line

Travel Time Index (assuming incidents are on corridor and not on subsequent stretches over which the I-270 ICM project has no influence)

  • Corridor daily vs. off-peak – 1.5

  • Corridor Incident vs. peak – 1.7

  • Freeway daily vs. off-peak – 1.5 – influenced by bottleneck outside of corridor boundaries to the north (evening rush hour) and other congested roadways to the south (morning rush hour)

  • Freeway incident vs. peak – 1.7

  • Arterials daily vs. off-peak – 1.5 – same problem as freeways

  • Arterials incident vs. peak – 1.7

  • Metrorail daily vs. off-peak – 1.0

  • Metrorail incident vs. peak – 1.4

  • Metrobus daily vs. off-peak – 1.4

  • Metrobus arterial incident vs. peak – 1.6

  • Ride On Bus daily vs. off-peak – 1.2

  • Ride On Bus arterial incident vs. peak – 1.4

Buffer Index

  • Corridor wide buffer index of 25 percent

Average Delay per Trip (during incidents)

  • Corridor – 17 minutes

  • Freeway – 15 minutes

  • Arterials – 20 minutes

  • Metrorail – 10 minutes

  • Metrobus – will be different for each line

  • Ride-On Bus – will be different for each line

Incident Detection and Response Times combined

  • Freeway – 5 minutes

  • Arterials – 10 minutes

  • Metrorail – 5 minutes

  • Metrobus – 10 minutes

  • Ride-On Bus – 10 minutes

Incident Clearance Times

  • Freeway – 15 minutes

  • Arterials – 20 minutes

  • Metrorail – 10 minutes

  • Metrobus – 20 minutes

  • Ride-On Bus – 20 minutes

Average parking availability per facility per time of day

  • Zero average availability at end of peak period 95% of the time

  • 80% Utilization of currently underutilized parking lots

Multimodal Switch estimated via traveler survey

  • 10 percent of travelers switching modes based on traveler information provided during incidents and/or events.

Customer satisfaction as obtained from traveler surveys

  • 75 percent overall satisfaction with corridor

  • 80 percent satisfaction with corridor traveler information and accuracy

Some of the data identified above will be harder to collect because they require gathering and merging data from different stakeholders, which means coordinating and potentially adjusting collection period starting times and collection frequencies.

The unique and project-specific configuration of the transportation modes in the I-270 Corridor will require that data are collected for certain links. For example, in order to provide a commuter traveling southbound on I-270 towards the Beltway with travel time information, that information will need to be collected from the I-370 interchange to the Beltway in order to display a comparison of the travel time using the Metrorail line from I-370 to the Beltway. Similar displays of travel time comparisons can be provided on other routes.

It is understood that data-collection for these performance measures will need to be identical from the various stakeholders in order to provide meaningful comparisons. Naturally, the data collection methods will have to be different depending on stakeholder, data-collection technology and equipment, and meaningful collection periods. For example, travel times and delays for Metrorail, Metrobus, and Ride On Bus will be collected using the available on-board technologies (AVL in case of Metrobus and Ride On and Block Closed Circuits for Metrorail), while freeway and arterial travel times will be an indirect measure of link speed and distance.

Additionally, parking availability (number of spaces) will be collected by the responsible agencies using the existing parking management systems.

For travel time comparison purposes and travel decision support, the “true” travel times will be calculated for each alternative travel mode. An average parking time for driving to Park-n-Ride lots and for bus/rail mode transfers and wait times will be added, along with the potential impact of any incidents.

An education campaign will be developed and deployed to educate travelers about the travel times and how to make decisions between the travel modes available within the corridor.

5. OPERATIONAL SCENARIOS

Sample representative scenarios for the I-270 ICM Corridor are presented in this section. These scenarios identify how the stakeholder agencies will interact and respond to the described events and assumed conditions. It is understood that these sample scenarios cannot be all-inclusive, but they can provide an understanding of the response operations parameters and protocols.

An underlying assumption for all the scenarios is that the pre-defined response plans on a foundational level were developed and agreed-upon by the involved stakeholder agencies. Naturally, ad-hoc decisions necessitated by particular situations will still be allowed by each of the stakeholder agencies.

Operational scenarios addressed in this chapter include the following:

The first scenario represents the condition of recurring congestion that occurs on a daily basis during the work week. The other scenarios address different types of non-recurring congestion such as incidents, planned events, and evacuations. As suggested by the FHWA JPO Concept of Operations Guidelines, the Washington State DOT and Washington State Transportation Center definitions2 for recurring and non-recurring congestion have been adopted for the I-270 ICM project:

The transit-related operational response to roadway-related recurring congestion, incidents, and scheduled events has been considered in the following scenarios. It should be noted that additional scenarios could be created that pertain to transit-generated incidents. Transit-related incidents might be caused by increased demand (e.g., due to an event), disabled transit vehicles, or other outages within the transit infrastructure.

The approach taken in developing these scenarios is to provide a brief description of each scenario and the overall response. A summary table identifies the specific ICM strategies to be deployed and other operational details (e.g., potential DMS messages); and the respective roles (e.g., lead/support) and responsibilities for the stakeholder agencies during each of the scenarios. It needs to be noted that integrated corridor management will always require some degree of "manual" communications between centers (e.g., via phone and radio) and interaction between stakeholders (e.g., meetings to discuss and resolve issues) in addition to the presented I-270 ICM strategies.

5.1 Daily Operational Scenario

The following scenario for recurring congestion is an example that is lived out by I-270 commuters daily. For many people, the commute starts from north and east of Frederick, Maryland, where a commuter enters the I-270 Corridor from US-15. After entering the I-270 ICM project boundary, the commuter experiences congestion due to high volume. The DMS’s along the corridor display travel times to the various known points along the corridor. Some of the DMS’s, specifically those prior to the exits with easy access to Metro stations (Shady Grove, Rockville Center, etc.), additionally show travel time comparisons to indicate how much time it will take to get to the Washington Beltway remaining in the car versus exiting, parking, and taking Metrorail (this information would be turned off once the parking lots are filled). DMS’s off I-270 and closer to these Metro stations will also include information about number and location of open parking spots.

There are known points on the corridor that will slow the commute, sometimes to a complete stop, because of traffic entering the main roadway from the arterial roads. This is especially noticed as traffic from the two-lane collector/divider system (“local lanes”) that brings traffic from Shady Grove Road, Falls Road, and Montrose Road enter onto I-270 (“express lanes”).

At each of those locations the commute slow to stop-and-go or a complete stop.

The last place for congestion before entering the I-495 Capital Beltway is the split where I-270 divides to a southbound path to Virginia, via I-495 and a northbound spur to the I-495 Capital Beltway.

Table 5-1. Daily Operational Scenario

ICM Strategies/Other Operational Details

Agency/Entity

Role and Responsibilities

The RITIS system, being operational, has no incident information displayed

Usual information-sharing between agencies, to include reports to Radio Stations

Arterial Traffic Signal activation as appropriate for time-of-day

Local transit agencies providing AVL/ Parking information

Multi-agency/multi-network incident response teams and service patrols


RITIS

  • Coordination – ensuring accurate traveler information and the proper coordination shared data between agency systems using a Center-to-Center interface

  • Providing information to traffic information outlets

CHART

  • Monitor freeway sensors and CCTV

  • Monitor arterial CCTV

  • Manage/Operate State DMS signage

  • Operate freeway service patrols

Montgomery County

  • Manage signal operations/adjust signal timing

  • Monitor traffic sensors on traffic arterials

  • Monitor arterial CCTV

  • Monitor freeway sensors and CCTV

  • Manage/Operate county DMS signage

WMATA Metro Rail and Bus

  • Monitor rail and bus headways/schedules

  • Location data for Metro vehicles posted to local displays and intercom system

  • CAD/AVL data for buses, once operational, posted to local displays and intercom system

  • Monitor parking availability

  • Passenger counts

Ride On Bus

  • Monitor bus headways/schedules

  • CAD/AVL data posted to local displays and intercom systems

  • Monitor parking availability

  • Passenger counts

MARC Train

  • Monitor train headways/schedules

  • Arrival information posted to local displays

  • Monitor parking availability

  • Passenger counts

Emergency Services

  • Regular operations/patrols

5.2 Scheduled Event Scenario

The following scenario outlines the typical ”planned event,” which would have been broadcasted to the motorists and commuters days in advance via DMS, HAR/TAR, Web pages, and other media outlets. Driving southbound from Frederick on I-270 for the morning commute, there is information on the DMS sign in Frederick County that informs motorists that the express lanes between Shady Grove Road and Gude Drive will be under repair until 9 AM. The typical traffic volume on the roadway at that time-of-day emphasizes the need to merge traffic onto the local lanes and to inform motorists to consider taking alternate routes or transit. Before approaching the I-370 interchange, both the SHA and Montgomery County Highway/Traveler Advisory Radio stations are providing details of the repair work including location, duration, and impact. Additionally, the southbound DMS on I-270 close to Middlebrook Road informs motorists of the location, duration, and impact of the repair. All these information devices also inform motorists of alternative modes and routes. The broadcasted option for an alternate route is to exit on to I-370 East towards MD-355, one of the possible alternative routes (another possible alternate route is going west onto Sam Eng Hwy, via Great Seneca Hwy to Darnestown Road back towards I-270; however, for this event it has been decided to route motorists via MD-355).

Taking the exit from I-370 to MD-355, the traffic is already heavy but is flowing because of the already implemented modification to the traffic signal timing on both Shady Grove Road and MD-355.

Prior to exiting from I-370 to Shady Grove Road, a new DMS informs motorists of the option to either proceed towards the Shady Grove Road exit or to remain on I-370 to go towards the Shady Grove Metro station. The parking management system that monitors the parking lots at the Metro stations provides information of the total number of open parking spaces available in the parking lots. From there, either Metrorail or Metrobus may be used by commuters to reach their final destinations. Motorists choosing to use the Metro facilities and transit will reach the entrance of the Metro station where other DMS will provide additional information to speed up the locating of available spaces within the parking lots. The motorists, after parking their cars, head towards the Metro lines using the regional SmartCard, which they will also use to pay for parking upon their return. WMATA, having been informed of the construction event well in advance, has calculated that additional Metrorail vehicles will be needed at the Shady Grove station and increases the number of trains by letting more of the trains that typically turn around at the Grosvernor Station go through to Shady Grove and turn around there.

At each location providing entrance to the Metro system, the parking management system informs the motorists of available parking spaces.

Highway Advisory Radio and local radio information provides information if I-270 is free flowing or congested after the scheduled road repairs. This route can be taken until MD-355 intersects with the I-495 Capital Beltway for those vehicles traveling north to Maryland or, at Rockville, the vehicles can re-enter I-270 at Jefferson Street and again at Montrose Road.

Table 5-2. Scheduled Event Scenario

ICM Strategies/Other

Operational Details

Agency/Entity

Role and Responsibilities

The RITIS system, being operational, has sent information notices to the corridor agencies notifying them of the scheduled repair work; usual information is being sent for all other areas of the corridor

Appropriate traveler Information devices (DMS, HAR, 511) are broadcasting/ displaying appropriate messages alerting motorist of the repair work location, duration, impact and alternative routes


Usual information sharing between agencies include reports to Radio Stations; the reports include the location, duration, impacts and alternative routes of the scheduled repair

Arterial Traffic Signal activation as appropriate for time of day plus optimized timing for additional traffic due to repair work

Local transit agencies providing AVL/ Parking information.

Multi-agency/multi-network incident response teams and service patrols


RITIS

  • Coordination – ensuring accurate traveler information and the proper coordination shared data between agency systems using a Center-to-Center interface

  • Coordinating plans for detour route and detour messages

  • Provide travel times and travel time comparisons for different travel modes to the stakeholder agencies for display on DMS

  • Provide transit parking information to other agencies for display on selected DMS

  • >Providing information to traffic information outlets

CHART

  • Monitor freeway sensors and CCTV

  • Manage/Operate State DMS signage

    • Place messages on appropriate DMS signs

    • Place Messages on HAR

  • Monitor arterial CCTV

  • Operate freeway service patrols

  • Put up work zone signage

  • Monitor conditions and activities of the incident (including performance measures)

Montgomery County

  • Manage signal operations/adjust signal timing

  • Monitor signal optimization for proper vehicle through-put

  • Monitor traffic sensors on traffic arterials

  • Monitor arterial CCTV

  • Monitor freeway sensors and CCTV

  • Manage/operate county DMS signage and local traveler information programs

WMATA Metro Rail and Bus

  • Monitor rail and bus headways/schedules

  • Location data for metro vehicles posted to local displays and intercom system

  • CAD/AVL data for buses, once operational, posted to local displays and intercom system

  • Monitor parking availability and alert public of open spaces via RITIS

  • Passenger counts

Ride On Bus

  • Monitor bus headways/schedules

  • CAD/AVL data posted to local displays and intercom systems

  • Monitor parking availability

  • Passenger counts

MARC Train

  • Monitor train headways/schedules

  • Arrival information posted to local displays

  • Monitor parking availability

  • Passenger counts

Emergency Services

  • Regular operations/patrols

  • State Police provide increased enforcement for the work zone

5.3 Incident Scenario

5.3.1 Minor Traffic Incident Scenario

The possibility of a traffic incident along the I-270 Corridor can happen at any time with the amount of traffic that flows through the corridor. The following scenario defines the actions taken by the stakeholder agencies when vehicles are involved in a crash that cannot be moved to the shoulder.

Just as the afternoon rush is about to begin, two vehicles traveling northbound on I-270, just past the I-370 exit collide and one vehicle hits the barrier wall and comes to an abrupt stop. The driver of the first vehicle is able to maintain control and eventually brings the vehicle to a stop. The shoulder/emergency lane and the right lane are blocked, with debris in the middle lane. Both vehicles are unable to move to the shoulder lane.

The accident is reported by a cellular call to the Montgomery County 911 Center. Since the 911 Center is co-located with the fire and the transportation management centers within Montgomery County, the emergency agencies are notified almost immediately as the 911 information was added to the CAD/AVL System. The operators within the 911-dispatching unit, as well as the traffic divisions of Montgomery County, are notified and, having access to the CCTV, use the CCTV nearest the crash location to verify the incident.

After verification the police, fire, and emergency rescue teams are dispatched to the scene. Seeing that the vehicles need a wrecker in order to be moved, the responsible dispatcher also informs tow truck operators to get ready for dispatching to the accident scene.

An automatic notification is placed into RITIS via the CAD-connected Montgomery County TMC software and the other corridor agencies receive notification of the accident. Preliminary information is added to the 511 system and to the travel information Web sites. Warning messages are place on DMS signs leading to the I-270 Corridor, advising motorists to be alert and that delays are possible.

The police dispatch, using the AVL system, locates the nearest patrol car and it arrives on the scene as the Emergency Medical Team does. After confirming that the vehicles do in fact need to be towed, the officer calls the dispatcher who dispatches the already stand-by tow trucks to go to the crash site.

The first arriving officer also uses the patrol car to block the right lane ahead of the wrecked vehicles causing the traffic to slow and merge into the open lanes. The emergency medical team administers first aid and monitors the victims for adverse signs of trauma. The Emergency Road Patrol arrives to set up traffic control upstream of the accident, warning drivers of the problem area by using his flashing light board. The two tow trucks arrive at the scene and each load a vehicle to be removed from the roadway. Each driver is able to ride with the tow trucks to a location of their choosing. The Emergency Medical team leaves the area, followed by the Police. While the response agencies are about to clear the incident scene, the Emergency Road Patrol turns off the emergency flasher and leaves the incident area. Since the traffic volume increased steadily during the incident at the beginning of the afternoon rush hour, the traffic takes quite a long time before resuming to normal flow. The information on the traveler information devices, particularly the DMS and HAR/TAR, are adjusted to change from typical information about an incident to a message indicating worse-than-normal traffic due to the accident conditions.

During the incident, some vehicles utilize the Collector/Divider lanes (i.e., Local Lanes) to get around the crash scene. As the local lanes quickly fill to capacity, the majority of the traffic exits at I-370 and proceeds to detour to either MD-355 or to Great Seneca Hwy (MD-119). The operators at the traffic center in Montgomery County verify the traffic flow and monitor the signal optimization patterns. The cycle lengths are adjusted for the added capacity. Those travelers that detoured on to Great Seneca Hwy return to I-270 at Quince Orchard Road (MD-117) to find traffic free flowing and are able to resume their original commute. The traffic detouring to MD-355 also returns to I-270 at Montgomery Village Avenue (MD-124) to resume their commute as well.

Table 5-3. Minor Traffic Incident Scenario

ICM Strategies/Other

Operational Details

Agency/Entity

Role and Responsibilities

The RITIS system, being operational, creates an incident and notifies the corridor agencies


Traveler Information devices (DMS, HAR, 511) are loaded with appropriate messages alerting motorist of the accident and possible delays


Notification between agencies to include reports to Radio Stations; these reports will include the location of the crash.


Arterial Traffic Signal timing plan activation as appropriate for time-of-day plus optimized time for additional traffic due to traffic overflow


Local transit agencies providing AVL/ Parking information


Multi-agency/multi-network incident response teams and service patrols


RITIS

  • Coordination – ensuring accurate traveler information and the proper coordination shared data between agency systems using a Center-to-Center interface

  • Coordinating plans for detour route and detour messages

  • Provide travel times and travel time comparisons for different travel modes to the stakeholder agencies for display on DMS

  • Provide transit parking information to other agencies for display on selected DMS

  • >Providing information to traffic information outlets

CHART

  • Monitor freeway sensors and CCTV

  • Manage/Operate State DMS signage

    • Place messages on appropriate DMS signs

    • Place Messages on HAR

  • Monitor arterial CCTV

  • Operate freeway service patrols

  • Monitor conditions and activities of the incident (including performance measures)

Montgomery County

  • Notification of RITIS, and local Fire, EMS and wrecker service

  • Manage signal operations/adjust signal timing

  • Monitor signal optimization for proper vehicle through-put

  • Monitor traffic sensors on traffic arterials

  • Monitor arterial CCTV

  • Monitor freeway sensors and CCTV

  • Manage/Operate county DMS signage and local traveler information programs

WMATA Metro Rail and Bus

  • Monitor rail and bus headways/schedules

  • Location data for metro vehicles posted to local displays and intercom system

  • CAD/AVL data for buses, once operational, posted to local displays and intercom system

  • Monitor parking availability and alert public of open spaces via RITIS

  • Passenger counts

Ride On Bus

  • Monitor bus headways/schedules

  • CAD/AVL data posted to local displays and intercom systems

  • Monitor parking availability

  • Passenger counts

MARC Train

  • Monitor train headways/schedules

  • Arrival information posted to local displays

  • Monitor parking availability

  • Passenger counts

Emergency Services

  • Regular operations/patrols

  • Local Police provide accident removal and traffic control

5.3.2 Major Traffic Incident Scenario

In the event of a major traffic accident involving several vehicles and multiple response agencies in the I-270 Corridor, the partner agencies will be utilized to maintain travel in the corridor.

Due to fog in the early morning hours and several motorists ignoring the posted DMS messages advising them to reduce speed, a multi-vehicle crash involving commercial vehicles occurs along the southbound I-270 Corridor at the Shady Grove Road interchange. One tractor-trailer carrying a hazardous substance overturns, with a second commercial vehicle damaging the middle overpass support. Several points along the dividing barrier between the north- and south-bound lanes are damaged. Almost immediately a motorist places a cellular call to the 911 Center in Montgomery County; however, the motorist is unable to report the number of personal vehicles involved in the incident.

The 911 operator immediately enters the information into the CAD system which automatically notifies the Police and Fire dispatches co-located within the facility. The Traffic operator verifies the accident using the CCTV along the corridor.

After verification of the incident, the police, fire, and emergency rescue teams are dispatched to the scene. An automatic notification is placed into RITIS via the CAD-connected Montgomery County TMC software and all the stakeholder agencies within the I-270 Corridor receive notification of the accident. Preliminary information is added to the 511 system and to the travel information Web sites. Warning messages are place on DMS signs leading to the I-270 Corridor, advising motorists to be alert and that delays are probable.

As the first police officer arrives at the scene, she realizes the impact of the crash because of the commercial vehicle carrying the hazardous substance; she notifies the commercial carrier’s dispatch center of the severity of the incident. The realization that a hazardous chemical release may be involved escalates the situation and the area is isolated and the Hot Zone is established according to the National Incident Management System. Traffic both north- and south-bound is stopped.

The first Emergency Medical crew arrives and observing multiple injuries, immediately calls for medical support and dispatches a medical helicopter en-route.

The TMC, as directed, activates the Emergency Operations Center, and notifications go out to the appropriate personnel to report to the Emergency Operations Center.

Traffic Detour routes are put into place with notifications sent to the corridor agencies to alert travelers that I-270 is completely closed to vehicular traffic in the southbound direction.

The Metrorail and Metrobus, in conjunction with the Marc Train systems, prepare for increased ridership.

As the incident unfolds, there are three major areas of concern: (1) life and health safety of those involved in the crash; (2) the commercial vehicle containing the hazardous materials; and (3) the structural damage to the overpass and barrier wall.

The duties of the corridor agencies are as follows:

Table 5-4. Major Traffic Incident Scenario

ICM Strategies/Other

Operational Details

Agency/Entity

Role and Responsibilities

The RITIS system, being operational, creates an incident and notifies the corridor agencies


Traveler Information devices (DMS, HAR, 511) are loaded with appropriate messages alerting motorist of the accidents and road closure


Notification between agencies to include reports to Radio Stations; these reports include the location of the accident and information encouraging travelers to switch to alternative Transit transportation during corridor closure


Arterial Traffic Signal timing plan activation as appropriate for time of day plus optimized time for additional traffic due to traffic overflow


Local transit agencies providing AVL/ Parking information.


Multi-agency/multi-network incident response teams and service patrols.


RITIS

  • Coordination – ensuring accurate traveler information and the proper coordination shared data between agency systems using a Center-to-Center interface

  • Coordinating plans for detour route and detour messages

  • Provide travel times and travel time comparisons for different travel modes to the stakeholder agencies for display on DMS

  • Provide transit parking information to other agencies for display on selected DMS

  • Providing information to traffic information outlets

  • Public outreach for MARC / Metro availability

CHART

  • Monitor freeway sensors and CCTV

  • Manage/Operate State DMS signage

    • Place messages on appropriate DMS signs

    • Place Messages on HAR

  • Monitor arterial CCTV

  • Operate freeway service patrols

  • Put up work zone signage

  • Monitor conditions and activities of the incident (including performance measures)

Montgomery County

  • Notification of RITIS, and local Fire, EMS and wrecker services

  • Activation of the County Emergency Operations Center

  • Actively manage incident until relieved by higher authority

  • Establish long term detour routes

  • Manage signal operations/adjust signal timing

  • Monitor signal optimization for proper vehicle through-put

  • Monitor traffic sensors on traffic arterials

  • Monitor arterial CCTV

  • Monitor freeway sensors and CCTV

  • Manage/Operate county DMS signage and local traveler information programs

WMATA Metro Rail and Bus

  • Monitor rail and bus headways/schedules

  • Location data for metro vehicles posted to local displays and intercom system

  • CAD/AVL data for buses, once operational, posted to local displays and intercom system

  • Monitor parking availability and alert public of open spaces via RITIS

  • Passenger counts

  • Public outreach for availability during corridor closure

Ride On Bus

  • Monitor bus headways/schedules

  • CAD/AVL data posted to local displays and intercom systems

  • Monitor parking availability

  • Passenger counts

  • >Public outreach for availability during corridor closure

MARC Train

  • Monitor train headways/schedules

  • Arrival information posted to local displays

  • Monitor parking availability

  • Passenger counts

  • Public outreach for availability during corridor closure

Emergency Services

  • Safety Patrol – Regular operations/patrols, set up detour signage, traffic control

  • State Police – Provide incident management local to the scene

  • Medical – provide medical services at the accident scene

  • Local Police provide traffic control

  • Tow Trucks – remove vehicles

5.4 Evacuation Scenario

A Category 4 Hurricane is approaching the Chesapeake Bay area. It is predicted that the eye will pass directly over the Washington, D.C. area. The governing officials within the entire metropolitan area have issued an evacuation order for the surrounding areas. Local officials have notified the transportation agencies of a pending evacuation order for the region, including the I-270 Corridor.

Based on previous modeling and analyses of such an emergency scenario (performed on a regional, statewide, and multi-state basis), it is well understood that the evacuation order will significantly impact all modes of transportation within the I-270 Corridor; the freeway facility will be the primary route for the evacuation. Rail service to outlying stations combined with bus service from the stations to designated shelters (outside the zone of predicted storm surge) will also need to be provided for those residents who do not own cars.

Evacuation routes, designated shelters, and related emergency procedures have been identified as part of a statewide hurricane evacuation plan. In accordance with the hurricane plan, the Emergency Operations Center (EOC) for Montgomery County is activated for managing the evacuation for routes north through the I-270 Corridor.

Montgomery County is designated the lead for implementing, coordinating, and operating the transportation elements of the evacuation response plan within the I-270 ICM corridor. It will also coordinate the network-specific responses, including the following:

It should be noted that this plan focuses only on the evacuation scenario. Additional plans have been developed for coordinating transportation clean-up and clearance activities (e.g., prioritize and perform emergency repairs); and for re-entry into the evacuated areas.

Table 5-5. Evacuation Scenario

ICM Strategies/Other Operational Details

Agency/Entity

Role and Responsibilities

Information Sharing and Distribution - The RITIS system, being operational, has sent information notices to the corridor agencies notifying them of the planned evacuation


Traveler Information devices (DMS, HAR, 511) are loaded with appropriate messages alerting motorist of alternate evacuation routes


Activation of ”special” transit signal priority to accommodate buses serving the Regional Rail stations


Signal pre-emption/"best route" for emergency vehicles


Multi-agency/multi-network incident response teams and service patrols


Promote network shifts (use of freeway or regional rail/shuttle bus for evacuation)


Add transit capacity by adjusting headways and number of transit vehicles (regional rail)


Add temporary new transit service (shuttle bus service to regional rail stations, and from outlying stations to shelters)


Coordinate scheduled maintenance and construction activities among corridor networks (close down all such activities).

RITIS

  • Coordination with all agencies using a Center-to-Center interface, ensuring that all are kept up-to-date on all activities and the potential impact on their respective operations.

  • Coordination, ensuring accurate traveler information, including information on detour routes and revised transit service if applicable.

  • Providing information to traffic information outlets

  • Public outreach for MARC / Metro availability

CHART

  • Monitor all conditions within corridor (including performance measures)

  • Set portable DMS to aid in locating detour routes

  • Provide additional freeway service patrols

  • Monitor freeway sensors and CCTV

  • Manager/operate DMS, making changes as appropriate

  • Suspend State construction projects (if any) on the corridor

  • Activate Public Information Officer to coordinate information between state and county agencies

  • >Operate freeway service patrols and provide additional patrol shifts if needed in the area

Montgomery County

  • Lead role in managing traffic throughout the corridor

  • Manage detour routes

  • Monitor traffic sensors/volumes

  • Monitor arterial and detour route CCTV

  • Monitor Signal optimization and manage signal operations to adjust signal timing if needed

  • Manage/operate county owned DMS

  • Provide CHART with requests for message display on freeway DMS

  • Assign appropriate personnel at key sites to oversee operations and to provide consistent

  • Verified public information to emergency management agencies, public information officers, and the media

  • Suspend County sponsored construction activities on the arterials and detour routes.

WMATA Metro Rail and Bus

  • Provide shuttle bus service to rail stations, and from outlying stations to shelters

  • Add vehicles and trains to accommodate increase in ridership

  • Coordinate with MARC Train for increased ridership

  • Monitor rail and bus headways/schedules

  • CAD/AVL data posted to local displays and intercom systems

  • Monitor parking availability and alert public of open spaces

  • Passenger counts

  • >Public outreach for availability during corridor closure

Ride On Bus

  • Provide shuttle bus service to rail stations, and from outlying stations to shelters

  • Add vehicles to accommodate increase in ridership

  • Coordinate with MARC Train for increased ridership

  • Monitor bus headways/schedules

  • CAD/AVL data posted to local displays and intercom systems

  • Monitor parking availability

  • Passenger counts

  • >Public outreach for availability during corridor closure

MARC Train

  • Monitor train headways/schedules

  • Arrival information posted to local displays

  • Monitor parking availability

  • Passenger counts

  • Public outreach for availability during corridor closure

Emergency Services

  • State Police assume overall lead role working out of EOC

Footnote 1: NTCIP – National Transportation Communications for ITS Protocols – a suite of ITS standards detailing how a central system is to communicate with a field device in a standardized, interoperable manner. Back

Footnote 2: Measurement of Recurring Versus Non-Recurring Congestion: Technical Report, Technical Report and Final Report Research Project T2695; Washington State Transportation Center (TRAC); Washington State Transportation Commission, Department of Transportation and in cooperation with U.S. Department of Transportation Federal Highway Administration; October 2003. Back


MARYLAND I-270 CORRIDOR
ICM CONCEPT OF OPERATIONS
SUPPLEMENTAL MATERIAL

This material updates the I-270 Corridor ICMS Concept of Operations, previously submitted to USDOT on June 19, 2007.  It adds two new sections to the document:

The remainder of the ConOps document has not changed.

S-1 Updated I-270 Corridor Needs

Table S-1, on the following page, updates Table 1-2, Critical Needs of the I-270 Corridor, in the ConOps document.  The identical information appears in Table 3-10, and this information is updated as well.

The needs identified in Table S-1 are system-specific, were primarily extracted from the ConOps, and were used in developing system requirements.  There is a consistent, traceable relationship between most needs identified in Table S-1 and individual systems requirements.  The last column in Table S-1 specifies the system requirements associated with each need of the I-270 Corridor; these individual requirements are detailed in the System Requirements Specification dated March 31, 2008.

Table S-1: Updated I-270 Corridor Needs

Need ID

Description

Source

Requirements Satisfying Need

1. 

Need to expand corridor-wide information sharing to help disseminate reliable and real-time traveler information to commuters.

ConOps § 1.4, p. 8

Q-110-090, Q-110-090-010,

2.

Need tools and procedures to assist stakeholder agencies with operational decision-making for improved transportation management within the corridor.

ConOps § 1.4, Table 1-2, p. 9

F-1500, F-1500-030, F-1500-040, F-1500-040-010, F-1500-040-010-010, F-1500-040-010-020, F-1500-040-010-030, F-1500-040-010-040, F-1500-040-010-050

3.

Need for traffic signals to be able to respond to changing conditions on affected arterials and adjacent roadways, including I-270, to maintain optimal traffic flow.

ConOps § 1.4, Table 1-2, p. 9

P-1210, F-1210

4.

Need on-demand access to information comparing travel times by automobile and transit in real-time to help travelers make better informed travel decisions.

ConOps § 1.4, Table 1-2, p. 9

F-320-010, F-320-020, F-320-020-010, F-320-030

5.

Need to provide travelers access to accurate, reliable, and multi-modal travel information, both pre-trip and en-route, to enable travelers to make better informed travel decisions.

ConOps § 1.4, Table 1-2, p. 10

F-300, F-300-010, F-300-020, F-300-030, F-300-040, F-300-050, F-300-060, F-300-060-010, F-300-060-020, F-300-060-030, F-300-060-040, F-300-060-050, F-300-060-060, F-300-060-070, P-300, Q-300

6.

Need to exchange real-time information on road and transit conditions with the corridor’s managing partners and stakeholders to improve transportation management efficiency and traveler information dissemination.

ConOps § 1.5, p. 10

I-900, I-900-010, I-900-010-010, I-900-010-020, I-900-020, I-900-030, I-900-040, I-900-050, I-900-060, I-900-070, I-900-080, I-900-090, I-900-100, I-900-110, I-900-120, I-900-130, I-900-140, I-900-150, I-900-160, I-900-170, I-900-180, I-900-180-010, D-900, F-900, P-900

7. 

Need to establish connections with key corridor stakeholders to automate data exchanges between the I-270 ICMS and external systems.

ConOps § 1.6, Table 1-4, p. 12

I-900-010, I-900-010-010, I-900-010-020, I-900-020, I-900-030 I-900-040, I-900-050, I-900-060 I-900-070, I-900-080, I-900-090 I-900-100, I-900-110, I-900-120, I-900-130, I-900-140, I-900-150, I-900-160, P-900

8.

Need to provide real-time, corridor-based traveler information to the media and other ATIS providers via standards-based and standard data distribution interfaces to facilitate improved access to current transportation information.

ConOps § 1.6, Table 1-4, p. 12

F-310, F-310-010, F-310-020, F-310-030, F-310-040, F-310-040-010, F-310-040-020, F-310-040-030, F-310-040-040, P-310, Q-310

9.

Need to provide pre-trip and en-route real-time corridor traveler information to travelers for access to up-to-date transportation information.

ConOps § 1.6, Table 1-4, p. 12

F-300-010, P-300

10. 

Need to share notification-based information (e.g., incident alerts) that is accessible pre-trip and en-route to provide travelers with real-time access to information impacting the transportation network.

ConOps § 3.5, p. 38

F-300-020, F-300-030, F-300-040, F-300-050, F-300-060, F-300-060-010, F-300-060-020, F-300-060-030, F-300-060-040, F-300-060-050, F-300-060-060, F-300-060-070

11. 

Need to collect transit, traffic, and other transportation data of regional interest from stakeholders in the corridor for use in enhancing regional traveler information and transportation management functions performed by member agencies.

ConOps § 3.5, p. 40, ConOps § 3.7, p. 47

D-100, D-100-010, D-100-020, F-110, F-110-010, F-110-020, F-110-030, F-110-040, F-110-050, F-110-060, F-110-070, F-110-080, Q-110-090

12. 

Need to fuse collected transportation data into regional information to enhance regional traveler information and transportation management functions performed by member agencies.

ConOps § 3.5, p. 40

F-110-100, F-110-110

13.

Need documented policies and procedures for coordinated traffic/transit management and incident management within the corridor to improve safety and overall transportation flow.

ConOps § 4.5, Table 4-7, p. 66

O-1900, O-1900-010, O-1900-020, O-1900-030, O-1900-060, O-1900-050, O-1900-040

14.

Need ICMS backup and restore capabilities to minimize system downtime.

ConOps § 4.5, Table 4-7, p. 68

Q-2120

15.

Need up-to-date corridor response plans to better plan for, and respond to, recurring and non-recurring congestion and to enable the corridor to function more efficiently and react more effectively to changing traffic and transit conditions.

ConOps § 4.7, pp. 78-79

F-1500-030, F-1500-040, F-1500-040-010, F-1500-040-010-010, F-1500-040-010-020, F-1500-040-010-030, F-1500-040-010-040, F-1500-040-010-050, F-1510 I-1510

16.

Need to provide alarm notifications for incidents, etc. to stakeholder systems to improve transportation management operations.

ConOps § 4.7, p. 79

I-900-170

17.

Need to define common data collection frequency intervals among all stakeholders for data standardization and timeliness purposes.

ConOps § 4.9, Table 4-12, p. 82

I-900-180, I-900-180-010

18.

Need a Communications System with sufficient capacity and speed to support real-time data exchanges with stakeholder systems.

ConOps § 4.9, Table 4-12, p. 82

P-910, I-930

19.

Need to use common definitions for all data elements exchanged between the different software central systems operated by the I-270 ICM stakeholders so that there is a clear, unambiguous understanding between the interfaced centers as to the meaning of these data.

ConOps § 4.9, p. 83

D-900

20.

Need to utilize applicable ITS standards and other pertinent standards to achieve consistency among corridor stakeholder systems and improve overall corridor operations and maintenance efforts.

ConOps § 4.9, p. 83

C-1920-020-030, C-1920-020-020, C-1920-020-010, C-1920-020, C-1920-010, C-1920, C-1920-020-040, C-1920-030, C-1920-020-050,  C-1920-050

21. 

Need to avoid releasing sensitive information to non-authorized information outlets so as not to disrupt transportation management operations or alarm the public unnecessarily.

ConOps § 4.9, p. 84

Q-2100, Q-2100-010, Q-2100-020

22.

Need a documented Operations and Maintenance Plan to ensure that ICM strategies are applied consistently, efficiently, and in a manner that improves overall corridor performance.

ConOps § 4.9, p. 84

O-1910, O-1910-010, O-1910-020, O-1910-020-010

23.

Need to provide travel conditions at decision points to provide motorists with decision-making information, particularly travel times using one or another travel mode choice.

ConOps § 4.9, p. 84

F-320-020, F-320, F-320-010, F-320-020-010, F-320-030

24.

Need corridor-level performance measures to determine the effectiveness of the I-270 ICM strategies and operations in comparison to corridor goals and objectives.

ConOps § 4.11, p. 87

F-1700, F-1700-010, F-1700-020, F-1700-040, F-1700-050, F-1700-050-010, F-1700-050-020, F-1700-050-030, F-1700-050-040, F-1700-050-050, F-1700-050-060, F-1700-050-080, F-1700-050-090, F-1700-050-100, F-1700-050-110, F-1700-050-120, F-1700-050-130, F-1700-050-133 F-1700-050-136, F-1700-050-140, F-1700-050-150, F-1700-050-160, F-1700-050-170, F-1700-050-180, F-1700-050-193, F-1700-050-190, F-1700-050-196, F-1700-050-200, F-1700-050-210, F-1700-050-220, F-1700-060, F-1700-070, F-1700-070-010

25.

Need to archive data for data mining and performance measuring purposes.

ConOps § 4.11, p. 88

F-1700-020, F-1700-010

26.

Need standard operating procedures to improve communications and coordination and shorten response times.

ConOps § 4.11, p. 88

O-1910-020, O-1910-020-010

27.

Need to coordinate with corridor stakeholder agencies in utilizing appropriate traveler information devices (DMS, HAR, 511) for broadcasting/displaying appropriate corridor transportation messages.

ConOps § 5.2, Table 5-2, p. 96

F-310-040, F-310-040-010, F-310-040-020, F-310-040-030, F-310-040-040

28.

Need to provide travelers with reliable information in getting from one location to another location within the corridor.

ConOps § 1.4, Table 1-2, p. 10

F-330, F-330-010, F-330-020 F-330-030, F-330-040, F-330-040-010, F-330-050, F-330-060

29.

Need to log all data exchanges and alarm notifications for audit and evaluation purposes.

I-270 ICMS Project Team

F-900

30.

Need to provide suggested modifications to messages on traveler information field devices (e.g., DMS, HAR) to owning agencies to ensure accurate corridor-wide information is provided to motorists.

I-270 ICMS Project Team

F-1160, P-1160, F-1170, P-1170, F-1180, P-1180, F-1190, P-1190, F-1200, P-1200

31.

Need reporting/query tools for data analysis and research purposes.

RITIS ConOps § 2.6, pp. 31-32

F-1700-050-210, F-1700-040, F-1710, F-1710-010, F-1710-020, F-1710-030, F-1710-040, F-1710-050, F-1710-060, F-1710-070, F-1710-080, F-1710-090, F-1710-100, F-1710-110, F-1710-120, F-1710-130, F-1710-140,

 

32.

Need to exchange data with corridor stakeholder agency systems in a secure manner.

RITIS ConOps § 2.7,  p. 32

Q-2110

33.

Need to operate in a 24x7 environment, as corridor transportation management needs to operate continuously.

I-270 ICMS Project Team

Q-2130, Q-2130-010, Q-2130-020, Q-2130-030, Q-2130-040, Q-2130-050, Q-2130-060, Q-2130-070, Q-2130-080, Q-2130-090, Q-2130-100, Q-2130-110, I-930

34.

Need to automatically notify the System Administrator when a System failure occurs to minimize system downtime.

I-270 ICMS Project Team

P-2140, Q-2140

35.

Need a secure agency user interface available only to corridor stakeholder agency users for transportation management purposes.

RITIS ConOps § 2.4.1, p. 28

F-2300, Q-2300-010, Q-2300-020, Q-2300-030, Q-2300-040, Q-2300-050, P-2300-060, P-2300-070, F-2300-080, F-2300-090, F-2300-100, F-2300-110, F-2300-120, F-2300-130, F-2300-140, F-2300-150, F-2300-160, F-2300-170, F-2300-180, F-2300-190, F-2300-200, F-2300-210, F-2300-220, F-2300-230, F-2300-240, F-2300-250, F-2300-250-010, O-2300-260, O-2300-260-010, F-2300-270, O-2300-280, C-2300-290

36.

Need an easily accessible public user interface for traveler information purposes.

RITIS ConOps § 2.4.2, p. 28

F-2310, Q-2310-010, Q-2310-020, P-2310-030, P-2310-040, F-2310-050, F-2310-060, F-2310-070, F-2310-080, C-2310-090

37.

Need a secure System Administration user interface for system configuration and maintenance purposes.

RITIS ConOps Appendix A, Table A-1, p. 43

F-2320, Q-2320-010, Q-2320-020, Q-2320-030, P-2320-040, P-2320-050, F-2320-060, F-2320-070, O-2320-080, O-2320-090, C-2320-100

S-2 Regional Support for Maryland I-270 Corridor ICM

Maryland, Virginia, the District of Columbia, the Washington Metropolitan Area Transit Authority (WMATA), and the Metropolitan Washington Council of Governments (MWCOG) recently demonstrated their collective commitment to information-sharing and coordinated incident response by establishing a new regional initiative, the Metropolitan Area Transportation Coordination (MATOC) Program.  MATOC formalizes important interagency relationships, establishes common regional procedures and protocols, and identifies the Regional Integrated Transportation Information System (RITIS) as the central, automated mechanism for regional information exchange.  MATOC is discussed in more detail in Section 3.6 of the ConOps document. Throughout the ICM Stage 1 process, MATOC members have indicated strong, consistent support for the I-270 ICMS effort.  At an upcoming meeting on April 15, 2008, the MATOC Steering Committee expects to review, comment on, and adopt the following resolution:

Metropolitan Area Transportation Operations Coordination              RES/XX-XX  

MATOC Program Steering Committee Resolution  Resolution XX-XX

Short Title: Integrated Corridor Management Endorsement

On April 15, 2008, The Metropolitan Area Transportation Operations Coordination (MATOC) Program Steering Committee approved the following endorsement of the Maryland I-270 Corridor Integrated Corridor Management (ICM) Program:

Resolved:

WHEREAS the states of Maryland and Virginia, and the District of Columbia have demonstrated their commitment to coordinate and support regional sharing of transportation systems’ conditions and information management during regional incidents through integration of systems’ technologies, improved procedures and planning, and enhanced accuracy and timeliness of transportation information provided to the public; and

WHEREAS the MATOC Program Steering Committee consists of representatives from the District Department of Transportation (DDOT), Maryland Department of Transportation (MDOT), Virginia Department of Transportation (VDOT), and the Washington Metropolitan Area Transit Authority; and

WHEREAS the Maryland I-270 ICM Program is an initiative sponsored by the U.S. Department of Transportation and led by stakeholder agencies within the I-270 Corridor that is part of the Metropolitan Washington Council of Governments’ region; and

WHEREAS the Maryland I-270 ICM Program’s Vision includes the application of key technology systems and decision support tools that allow for real-time, multi-modal information sharing; and

WHEREAS the Maryland I-270 ICM System shall be built upon the regional information-sharing foundation known as the Regional Integrated Transportation Information System (RITIS); and

WHEREAS the Maryland I-270 ICM Program directly supports the MATOC Program’s commitment to coordinate and support regional sharing of transportation systems’ conditions and information management;

Now, therefore, let it be resolved that the MATOC Program Steering Committee formally endorses the Maryland I-270 Program and acknowledges the considerable synergy between its goals and initiatives and those of the MATOC Program.   