United States Department of Transportation - Federal Highway Administration FHWA HomeFeedback
Home

List of Figures

Figure 1. HOT Lane Implementation Process

Figure 2. HOT Lane Implementation Work Flow

Figure 3. HOT Lane Planning and Implementation Milestones

Figure 4. I-15 Brochures

Figure 5. SR 91 Website

Figure 6. Median-Based One-Lane Reversible Flow HOT Cross-sections

Figure 7. Median-Based Two-Lane Reversible Flow HOT Cross-sections

Figure 8. Median-Based Concurrent Flow HOT Cross-sections

Figure 9. Alternative HOT Lane Slip Ramp Configurations

Figure 10. HOT Lane Access, Electronic Toll Collection, and Enforcement Areas

Figure 11. Tubular Markers on SR 91

Figure 12. Concrete Barrier on I-394 Reversible Lanes, Minneapolis

Figure 13. I-15 HOV Lanes with Slip Ramp, Orange County, California

Figure 14. I-405 slip ramp and at-grade access, Orange County, California

Figure 15. Elevated HOV Drop Ramp

Figure 16. Grade Separated HOV to Highway Flyover Ramps

Figure 17. SR 91 Signage

Figure 18 Buffer Location Signing

Figure 19. I-15 Variable Message Sign

Figure 20 I-15 Police Car

Figure 21. HOT Revenue Estimate: Sketch Planning Process

Figure 22. The I-15 FasTrak Customer Service Center

Figure 23. Violation Detection Camera

Figure 24. Katy Freeway Location Map

Figure 25. SR 91 Express Lanes Location Map

Figure 26. I-15 FasTrak Location Map

Figure 27. Sonoma County Route 101 Location Map

Figure 28 Proposed I-25/U.S. 36 HOT Lane Corridor Location Map



Table of Contents | List of Contributors | List of Tables | Top of Section


FHWA Home | Office of Travel Management | Value Pricing Pilot Program | Feedback

FHWA