Table of Contents
[
Cover
]
[
Notice
]
[
SI Conversion Factors
]
[
Form DOT F 1700.7
]
[
List of Figures and Tables
]
PREFACE
Chapter 1
Scope and Summary
1.1 Introduction and Document Contents
1.2 ICM Corridor Boundaries, Networks and Stakeholders
1.3 Corridor Operating and Institutional Conditions
1.4 Need and Potential for Integrated Corridor Management
1.5 ICM Vision, Goals, and Objectives
1.6 ICM Operational Approaches and Strategies
1.7 ICM Concept of Operational Description
1.8 Required Assets and ICMS Implementation Issues
1.9 Generic Corridor ICM Concept Insititutional Framework
Chapter 2
References
Chapter 3
Existing Corridor Scope and Operational Characteristics
3.1 Corridor Boundaries and Networks
3.2 Corridor Stakeholders
3.3 Operational Conditions of the Generic Corridor and Included Networks
3.4 Existing Network-based Transportation Management/ITS Assets
3.5 Proposed Near-Term Network Improvements
3.6 Current Network-Based Institutional Characteristics
3.7 Regional ITS Architecture Review
3.8 Individual Network and Corridor Problems, Issues and Needs
3.9 Potential for ICM in the Generic Corridor
3.10 Generic Corridor Vision
Chapter 4
ICM System Operational Concept
4.1 Corridor Goals and Objectives
4.2 Application of ICM Approaches and Strategies
4.3 ICM Concept Asset Requirements and Needs
4.4 Comparison of ICM Concept Asset Requirements with Current and Potential Assets
4.5 Generic Corridor Concept Operational Description
4.6 Alignment with Regional ITS Architecture
4.7 Implementation Issues
4.8 Generic Corridor ICM Concept Institutional Framework
4.9 Performance Measures and Targets
Chapter 5
Operational Scenarios
5.1 Daily Operational Scenario
5.2 Scheduled Event Scenario
5.3 Incident Scenarios
5.4 Major Planned Special Event Scenarios
5.5 Evacuation Scenario