ITS - Intelligent Transportation Systems Report ITS Home Page

List of Figures and Tables

List of Figures

Figure 1 Schematic of Generic Corridor
Figure 2 "V" Diagram
Figure 1-1 Map of the Generic Corridor
Figure 1-2 Operational Responsibility for Corridor Networks
Figure 1-3 Institutional Framework of Generic Corridor ICMS
Figure 3-1 Map of the Generic Corridor
Figure 3-2 Operational Responsibility for Corridor Networks
Figure 3-3 Roadway Use During Typical Work Day
Figure 3-4 Transit Use During Typical Work Day
Figure 3-5 Existing Network-based ITS Assets
Figure 3-6 Regional ITS Architecture
Figure 4-1 Institutional Framework of Generic Corridor ICMS
Figure 5-1 Scheduled Event Scenario
Figure 5-2 Minor Traffic Incident
Figure 5-3 Major Traffic Incident
Figure 5-4 Minor Transit Incident Scenario
Figure 5-5 Major Transit Incident
Figure 5-6 Evacuation Scenario


List of Tables

Table 1-1 Layout — ICMS Concept of Operations
Table 1-2 Generic Corridor Stakeholders
Table 1-3 Attributes of Regional ITS Architecture
Table 1-4 Major Corridor Issues and Needs (as Identified by Stakeholders)
Table 1-5 ICMS Goals & Objectives
Table 1-6 Summary of Significant Changes and Additions to the Generic Corridor
Table 3-1 Generic Corridor Network Characteristics
Table 3-2 Generic Corridor Stakeholders
Table 3-3 Breakdown of Transportation System Users during Peak and Off-Peak Hours (Percent)
Table 3-4 Travel Market Trip Types in the Generic Corridor (Percent)
Table 3-5 Average Peak Period Travel Times; Corridor Length Trips
Table 3-6 Network Transportation Management Assets
Table 3-7 Corridor Issues and Needs (as Identified by Stakeholders)
Table 4-1 Generic Corridor Goals and Objectives for ICMS
Table 4-2 Relationship Between Corridor Goals and Needs
Table 4-3 Proposed ICMS Approahces and Strategies for the Generic Corridor
Table 4-4 Relationship Between ICM Operational Strategies and Corridor Goals
Table 4-5 Generic Corridor Asset Requirements
Table 4-6 Comparison of Existing Corridor Assets with ICM Requirements
Table 4-7 Summary of Significant Changes & Additions to the Generic Corridor
Table 4-8 ICMS Implementation Issues
Table 4-9 Corridor Command Center Staff
Table 4-10 Generic Corridor Performance Measures and Targets
Table 4-11 Potential Performance Measure Targets
Table 5-1 Summary: Daily Operational Scenario (Recurring Congestion)
Table 5-2 Scheduled Event Scenario
Table 5-3 Minor Traffic Incident Scenario
Table 5-4 Major Traffic Incident Scenario
Table 5-5 Minor Transit Incident Scenario
Table 5-6 Major Transit Incident Scenario
Table 5-7 Major Planned Special Event Scenario
Table 5-8 Evacuation Scenario